Loading...
HomeMy WebLinkAboutCorrespondence Grffi-411111144 CITY OF COLLEGE STATION Planning&Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 11, 2006 TO: Brett McCully, via fax 260-3849 FROM: Molly Hitchcock, Planning Administrator SUBJECT: ASHLEY HOME FRONT (SP) -Site Plan Staff reviewed the color samples and elevations as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised elevation sheet. If there are comments that you are not addressing with the revised plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Lindsay at 979.764.3570. Attachments: Staff review comments cc: Tony Majors, via fax 693.1744 Case file #06-00500044 Home of Texas A&M University 4,1115111111114 CITY OF COLLEGE STATION Planning&Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 13, 2006 TO: Brett McCully, via fax 260-3849 i/ FROM: Lindsay Boyer, Project Manager SUBJECT: ASHLEY HOME FRONT (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: $600 Infrastructure Inspection Fee One (1) revised site plan One (1) landscaping plan TxDOT Utility permit (4 copies) for fire hydrant connection Easement Dedication Sheet and required documents (please allow 4 weeks to process). Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Tony Majors, via fax 693.1744 Case file #06-00500044 Home of Texas A&M University (kffill111111111 CITY OF COLLEGE STATION Planning er Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570/ Fax 979.764.3496 MEMORANDUM March 13, 2006 TO: Brett McCuIIy, via fax 260-3849 i/ FROM: Lindsay Boyer, Project Manager SUBJECT: ASHLEY HOME FRONT (SP) -Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: $600 Infrastructure Inspection Fee One (1) revised site plan One (1) landscaping plan TxDOT Utility permit (4 copies) for fire hydrant connection Easement Dedication Sheet and required documents (please allow 4 weeks to process). Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Tony Majors, via fax 693.1744 Case file #06-00500044 Home of Texas A&M University _ I t � Varsity Ford LINCOLN MERCURY tii() May 1, 2006 Alan Gibbs, P.E. Development Engineer City of College Station P.O. Box 9960 College Station, TX 77845 Re: Ashley Furniture HomeStore Offsite Grading Permission Dear Mr. Gibbs, At this time, I am the owner of the property included within the High Ridge Replat subdivision, which includes the site where the Ashley Furniture HomeStore is currently being permitted. This letter shall serve to document my permission for the site grading and slopes related to the Ashley Project to extend beyond the limits of the actual parcel being developed, and onto the adjacent parcel to the north. When this northern parcel is developed, it too will receive a significant amount of fill, thus reducing (or possibly eliminating) this interim slope making any permanent provision here impractical. Should you have any questions regarding this matter, feel free to contact myself, or my Project Manager, Phil Kirk, at 979-694-2022. Thank you for your continued cooperation on this project. Sincerely, d Anth Majors Xe: Brett McCully, P.E. 1351 Earl Rudder Freeway South • College Station, Texas 77845 • (979) 694-2022 www.varsitytordlincolnmercury.com oi5�l B Bleyl & Associates Izps 1722 Broa moor & Suite 210 A Project Engineering & Management Bryan, TX 77802 yg> April 17, 2006 Bridgette George Development Coordinator City of College Station Planning and Development Services 1101 Texas Avenue P.O. Box 9960 College Station Texas 77842 RE: Ashley HomeStore Site Plan Review Case File #06-00500044 Dear Ms. George: The following are our responses to comments from the latest staff review for this project. PLANNING Coy 1--{tZ-tZ-P ; Our records indicate that the public infrastructure inspection fee has still not been paid (Refer Comment #2, Planning). Enclosed is a copy of the receipt showing the infrastructure review and inspection fee has been paid. The $300 on the receipt is for the cost increase from a minor plat to a replat for the High Ridge Subdivision, and the $600 is the infrastructure fee for this site plan.. `C`onZoning label for the adjacent properties (excluding the Varsity Ford site) are incorrect. This property was recently re-zoned to C-1, General Commercial. These labels have V- c.,vct 10 4 been changed. Building Height. The approximate building height is appreciated, however, if the building ends up having a height of over 30 feet, the fire lane must be able to accommodate an aerial truck. Please have your architect keep this in mind as it may require changes to your site plan. No changes are required. In anticipation of a building height greater than 30', a 26' wide fire lane has already been provided and striped along the entire east side of the building. This was done after consulting with Fire Marshall Staff after the first review. ugei. The phasing of the parking is allowed, however, please show the limits of the surfacing for Phase 1 and the curbing that will be provided. Additionally, once the parking lot exceeds 120 spaces, it must meet the requirements in Section 7.9 of the UDO. Please show how you will be meeting this with Phase 2 parking. Otherwise, we cannot approve this site plan with Phase 2 parking shown. Additional labels have been added to clarify the limits of the first phase parking. With regards to the ultimate development parking count, we respectfully believe that the referenced section will not apply to this site. As stated, the intent of Section 7.9 is to break up large parking lots. In the case of the Ashley development, the parking is spread around the building, thus providing the `breaking up' effect sought by the ordinance. While we concede that reasonable minds may disagree on whether there will be two or three parking lots that surround the Bryan Austin Conroe (979)-268-1125 (512)-328-7878 (936)-441-7833 (979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax building's three sides, it should be clear that there will not be any single parking lot that exceeds the 120 space limitation. Since any future parking expansion will have to be reviewed and permitted at that time, we expect that the rules and requirements in effect at that time will govern. 5. This site plan shall not be approved without a Landscape Plan that meets ordinance. Landscape and Irrigation Plans are being submitted for review. / L eT4 Fire has concerns about the Fire Lane access to the south end of the building facing Varsity Ford. Please show how a truck could make that turn. Additionally, the turnaround provided at the end of that drive aisle does not meet the requirements for a hammerhead or any alternative to a hammerhead. Please contact Jerry Duffy in the Fire Marshall's office for additional information 764-3400. The Fire Lane layout, including turning radii, widths, limits and the turnaround were all discussed personally with Eric Dotson on March 15th in response to the first round of comments. We applied the turning templates and length scales to verify at that time what would be acceptable to the Department. ENGINEERING A TxDOT Utility permit is required before Site Plan approval. A copy of the submitted permit is included. �. Temporary Blanket Easement is required before Site Plan approval. A TBE form will be provided based on the legal description from the newly approved plat. 3. Fire flow report needs to follow Fire Code in determining the flow based on construction materials, square footage of building, etc. Based on the Fire Code Apendix B, the building size of 35,000sf and the proposed automatic sprinkler system, the building will be required to be served with between 500 and 1250 gpm. Based on Appendiz C, on ly one fire hydrant would be required as originally submitted. However, since Mr. Dotson highly valued this additional hydrant during out 3/15 meeting, and since we did not have the final building construction typing from the architect, we have added the facility at no insignificant cost. In our last submittal we provided existing fire flow information from an adjacent hydrant indicating that these flows were easily obtained onsite. Given the high pressures of our water distribution system, the low volumes of water required, and the short extensions of service, we believe the ability to supply this water is obvious and beyond the necessity to analyze. 4. I do not see any revision to the drainage from what was submitted last time. You must take the flow to a defined channel or return to sheet flow. If you take discharge to the defined channel across the Greenway, it has to be environmentally friendly as previously commented. We have changed the alignment of our release point to better match the contour of the existing property. We believe our design affords protection to the Greenway by using a combination of our outlet structure and a short rock lined channel to dissipate the exit velocity of the runoff. It should also be noted that while constructing an unlined channel to the existing creek would meet the conditions of this comment, such improvements were specifically barred by the former Greenways Manager for the City, as this area is intended to be left as un-hampered by improvements as possible to allow for future trail node development. Referencing the drainage report submitted on March 3, 2006 for this project, runoff from the 1% storm event by drainage area is as follows: Drainage Area 1 5.91 cfs Drainage Area 2 8.32 cfs Drainage Area 3 0.94 cfs Drainage Area 4 7.73 cfs Drainage areas 1, 2, and 4 are collected and discharged at a common point, the opening in the discharge junction box. The cumulative flowrate is then 21.96 cfs that discharges through an 18"x 36"(4.5 square feet) opening for a velocity of 4.88 feet per second. A flared chute and wingwall is proposed to further dissipate the energy and calm the flow. After exiting the chute, a 20 foot long section of 6" — 12" diameter stone is proposed to further reduce the velocity as it is returned to sheet flow. Using a Manning Roughness coefficient of 0.03 yields an exit velocity at the release point at less than 3 feet per second, and a flow depth of less than 6 inches. 5. What is the velocity of the storm water discharge? Please see above. 6. Private taps are not allowed on 18" water mains. Please take service off the proposed fire hydrant line. Service is now taken off the fire hydrant line. 7. Show proposed PUEs for fire hydrant lines and fire line. A 15' wide PUE is now shown for the fire hydrant and fire line. 8. Show fire line to building and include in plan and profile. Fire line added to profile. 9. Engineer's cost estimate is required for public infrastructure. A cost estimate is included for your use. 10. Encase the portion of water line under the retaining wall. A casing has been added to this section of line. 11. Add note that construction will be in conformance with BCS Unified Design Guidelines, Specifications and Details. Also include sheet of pertinent details. Note added (Site Plan, General Note#15). 12. You will need a slope easement for off-site grading. Provide a copy of the filed instrument. Waiting on staff response. 13. Provide an Erosion Control Plan. An Erosion Control Plan is now provided. As we near the end of this process, please remember that we are more than willing to come by and visit about any or all of these issues. We know that Staff is very busy, but a simple 30 minute meeting could save all of us a lot of time and typing. Sin r ly, / Brett McCully, P.E. Senior Engineer/Branch Manager Cc: Mr. Tom James File _ cq�! NB 6115 fu"' E Bleyl & Associates 0: i/(1 1 722 Broadmoor Suite 210 Project Engineering & Management 1iji� Bryan, TX 77802 A Date 5/15/2006 Job No. 7025 Lindsay Boyer Attn: Lindsay Boyer Staff Planner Re: Ashely Home Front City of College Station Planning & Development Services 1101 Texas Avenue College Station, TX 77842 We are sending you: X Attached Under separate cover via: The following items: Drawings Prints X Plans Samples Copy of letter Change order Specifications Other Copies Date No. Description 6 5/15/2006 7025 Complete Sets of Construction Documents-Ashley Home Front 2 5/15/2006 7025 Revised Site Plans-Ashley Home Front 1 5/15/2006 7025 Landscaping Plan-Ashley Home Front 1 5/15/2006 7025 11 x 17 Grading&Erosion Control Plan These are transmitted as checked below: For approval For review and comment For your use X As requested For bids due: 7. Signed 1/Uully .E. Senior Engine r/Branch Manager Bryan Austin Conroe (979)-268-1125 (512)-328-7878 (936)-441-7833 (979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax i OLihi B Bleyl & Associates 3) 42 3., moor & 5 Sroaduite 210 Project Engineering & Management Bryan, TX 77802 A wok Date 3/27/2006 Job No. 7025 Bridgette George Attn: Bridgette George Development Coordinator Re: Ashley Furniture Homestore City of College Station Planning & Development Services P.O. Box 9960 College Station, TX 77842 (979) 764-3570 We are sending you: X Attached Under separate cover via: The following items: Shop drawings Prints X Plans Samples Copy of letter Change order Specifications X Other Fire Flow Report Copies Date No. Description 1 3/27/2006 7025 Fire Flow Test Report-Ashley Furniture Homestore ito)- 3/27/2006 7025 Site Plan-Ashley Furniture These are transmitted as checked below: For approval X For review and response For your use As requested For bids due: Signed retM ully .E. Sr. Engineer/Branch Manager Bryan Austin Conroe (979)-268-1125 (512)-328-7878 (936)-441-7833 (979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax B Bleyl & Associates 1722 Broadmoor & Suite 210 Project Engineering & Management Bryan, TX 77802 A opt March 27, 2006 Bridgette George Development Coordinator City of College Station Planning and Development Services 1101 Texas Avenue P.O. Box 9960 College Station Texas 77842 RE: Ashley HomeStore Site Plan ReviewSite Plan Case File #06-00500044 Dear Ms. George: The following are our responses to comments from the planning and engineering staff review for referenced project. Landscaping, and electrical plans will be submitted separately and are not addressed in this resubmittal. PLANNING 1. Change Title of Site Plan of Ashley Home Front. The title has been changed to Ashley HomeStore. 2. According to the site plan, a fire hydrant is being proposed. Any public infrastructure will be required a public infrastructure inspection fee of$600.00. The inspection fee is included with this resubmittal. 3. This submittal does not include elevations or material and color samples for • Non-Residential Architectural Standards approval. This may be submitted for review with the site plan, or at the time of building permit. However, a building permit will not be issued until NRA approval has been granted. This information will be submitted separately by the Architect. 4. Please provide note that a TIA will not be required for this site as documented by the ITE Traffic Generation report. Note added as General Note #11. 5. The required parking ratio for freestanding furniture sales is 1 space per 350 square feet. Please adjust the required number of parking spaces accordingly. Initially, only the required 110 spaces will be built. An additional 34 spaces are shown as Phase 2 and may be built at a later date. 6. Provide the address of this project in the title box. The correct address is now shown. 7. Provide Ownership information of all lots abutting this parcel. This information has been added. 8. Provide building height. The estimated building height of 26'-0"has been added. This is based on previous buildings constructed for this owner. The Architect's submittal will include the exact planned height of this particular building. Bryan Austin Conroe (979)-268-1125 (512)-328-7878 (936)-441-7833 (979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax 9. I was unable to locate the front building setback. Please include on the next submission or advise as to where I can find this note. The building setback line is now shown. 10. We have concerns about the configuration of the driveway from the Varsity Ford site. Please reconfigure the parking, end islands, and drive aisles at this entrance to provide for clearly delineated drive paths to minimize conflict between Varsity Ford, and traffic between the rear and front parking lots of Ashley Furniture. The entrance has been reconfigured as requested. 11. We were unable to locate a ST1-07 detail in the Street Design Guidelines as per the note on the site plan. Please provide paving details for the fire lane and the parking lot. Paving details have been added. 12. Provisions must be made for bicycle parking facilities in compliance with UDO Section 7.9 F, Pedestrian / Bike Circulation & Facilities. The required pad/bike rack has now been added and detailed. 13. The rear parking spaces loading towards the building do not meet minimum parking space depth. Please increase the depth to 20 feet or increase the width of the abutting sidewalk to the minimum 6 feet as required by UDO Section 7.2 C, Dimensions and Access. The sidewalk has been widened to 6'. 14. The end islands for the parking located next to the dumpster, and in the parking lot behind the building, next to the western most parking space, do not meet minimum area for end islands as required by UDO Section 7.2 D, End Islands. The dumpster pad area has been reconfigured as well as the back parking areas. All end islands now meet the minimum area requirements. 15. Parking lots with greater than 120 spaces must meet requirements set out in UDO Section 7.9 H, Parking Lots. While the intent of breaking up areas of 120 spaces has been met, the additional landscaping area that is required in all 3 concepts has not been met. A landscaping plan that meets these requirements will be submitted separately. 16. Please provide screening details for the dumpster enclosure in compliance with UDO Section 7.7, Solid Waste. A detail of the dumpster enclosure is now included. The screening will match the building and will be submitted with the Architectural plans. 17. It appears that the interior dimensions of the dumpster enclosure are not 12 feet by 12 feet clear. Please correct or provide dimensions. After talking with Sanitation Division, we will be using the 300 gallon container. The dumpster pad having an inside clear dimension of 10'x 10'will be constructed. 18. Proposed access easement does not line up with proposed vehicle connection to adjacent undeveloped lot. Please relocate easement on plat or line up the easement with the onsite access. This has been corrected. 19. Provide a general note that all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of- way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. This note has been added as General Note #12. 20. What is the loading area in the rear of the building? Required parking may not be located in a truck loading zone. This has been removed. 21. If dumpster is to remain in the PUE, please provide a note stating that should any portion of the dumpster enclosure be removed for utility work, the owner is responsible for its replacement in compliance with the ordinance in place at that time. The dumpster has been relocated and will not be built in the PUE. 22. A proposed easement is show extending to the Varsity Ford parking lot site, however, the parking blocks any connection between the two lots. The access easement should be a clear drive aisle so that future connection may be made upon redevelopment of the parking lot site. Parking has been reconfigured to provide this aisle. LANDSCAPING/STREETSCAPING/BUFFER 1. Provide landscape plan. Site plan may not be approved with an approved site plan. A landscaping plan will be submitted separately. 2. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights-of-way, and adjacent property disturbed during construction. This note has been added as General Note #14. MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. This item will be addressed in the landscaping plan. 2. All Back Flow devices must be installed and tested upon installation as per City Ordinance 2394. This item will be addressed in the landscaping plan. ENGINEERING 1. Provide Fire Flow Report. A fire flow report is now included. 2. Provide plan and profile for fire hydrant line. A plan and profile sheet for the fire hydrant lines are now included. 3. Relocate proposed fire hydrant to entrance island. You may also need additional fire lane and hydrant as the building currently is not covered in the 150' spray arc. We have met with the Fire Marshal's office and have agreed to add a second fire hydrant located in the rear. We have also coordinated the location of the front hydrant with their office. 4. If you plan to discharge stormwater across the Greenway, it will have to be designed environmentally friendly with minimal velocity and no erosion, i.e. plunge pools. 5. Show location of irrigation meter. Meter location will be shown on landscaping/irrigation plan. 6. Provide water service line size. This is now shown on the site plan. 7. Minimum sewer service diameter is 6" for commercial structures. A 6"service is now shown. 8. Submit TxDOT Utility permit (4 copies) for fire hydrant connection. This will be submitted separately. 9. FYI-You may want to place the dumpster closer to the loading dock. It might not be much fun hauling all the packing material from the back of the building to this location. As noted above, the dumpster has been relocated. Please do not hesitate to call me if you have any questions. Sincerel / i �• Brett McCully, P.( Senior Engineer/Branch Manager Cc: Mr. Tom James File B Bleyl & Associates 1722 Broadmoor 8L Suite 210 A Project Engineering & Management Bryan, TX 77802 July 28, 2005 Lindsay Boyer Planning& Development Services Department City of College Station P.O. Box 9960 College Station, TX 77842 Re: High Ride Development August 8tn PAC Information Dear Lindsay, Thank you for your assistance on this project over the phone yesterday. I understand how difficult it is to respond to complicated issues based on limited information. At your suggestion, we have set a PAC for Monday, August 8th, and this letter should serve to provide you as well as Carol with the background for the two main issues we currently have regarding this project. As background information, Bleyl &Associates has been working for Tony Majors, the owner of the vacant parcel of land located on the northbound SH6 frontage road immediately north of the existing Varsity Ford Dealership. Our efforts to date have been aimed at preparing the parcel for future development by relocating the 100 year floodplain in exchange for the dedication of the remaining floodplain to the City of College Station as a greenway. In this role, we have submitted a drainage development permit to address the grading, and a plat to address both the dedication and the relocation of the 100 year floodplain line. We received official comments on the plat during a June 14th facilitation meeting, and verbal comments on the grading and floodplain issues. Along with the timing of this letter, we are resubmitting the grading plans with the appropriate revisions per that facilitation meeting. Recently, we have been retained by a potential buyer of a portion of the property to assist in their evaluation of the property and its development potential. The current proposal is a retail furniture store comprised of approximately 35,000sf of retail display area, and Bryan Austin Conroe (979)-268-1125 (512)-328-7878 (936)-441-7833 (979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax 15,000sf warehousing area. The buyer is intending on purchasing approximately 3.75 acres of the property, leaving approximately 2.7 acres(not including the intended greenways dedication). The facility would share the existing driveway at the common corner with Varsity Ford, as well as an internal circulation aisle and second access point within the 2.7 ac remainder. The first question at hand relates to a conflict between the proposed use and those allowed under the current C-2 zoning. With the assumption that the building will not exceed 50.000sf,the use would be allowed under C-1 zoning. Therefore our first area of concern is verifying that staff would be supportive of rezoning the proposed parcel to C-1 like many other parcels along this strip of frontage. Our second question is drainage related. Current development guidelines would allow the development of this parcel without detention requirements because it abuts, and thus would drain directly into Carters Creek. However the current and proposed drainage path downstream of this development crosses the area intended to be dedicated to the City as greenway. Our question therefore is to verify that this development may proceed, without detention requirements, as long as appropriate drainage facilities are constructed to convey the flows directly to Carters Creek, and that the greenways dedication would still be acceptable with such a drainage facility. I have attached a draft site layout for your review, with the understanding that it is subject to change and modification. Because I will be out of the state on the day of this meeting, Sam Vernon of our office will attend the meeting to discuss the drainage issues, and our subconsultant Kelly Templin of IPS Group will attend to discuss the zoning and use issues. Should you have any questions, comments, concerns, or require additional information, please do not hesitate to contact me (through August 4th), or Sam Vernon after that date. Thank you again for your assistance. Sincerel , 1l� 4,/ Brett McCully, .E. Sr. Engineer/Branch Manager Cc: Tom James, 3JJJ Sam Vernon, B&A Kelly Templin,IPS Enc: Draft site schematic