HomeMy WebLinkAboutStaff Comments STAFF REVIEW COMMENTS NO. 1
Project: WPC MULTIPURPOSE FACILITIES (SDSP) — 06-00500038
PLANNING
1. Please provide the fire lane paving specs for the new fire lane addition. The general
parking pavement specs shown do not meet the minimum fire lane requirements.
2. Please provide a curb detail. All paved areas are required to be curbed.
3. Provide a general note that all roof and ground-mounted mechanical equipment shall
be screened from view or isolated so as not to be visible from any public right-of-way
or residential district within 150' of the subject lot, measured from a point five feet
above grade. Such screening shall be coordinated with the building architecture and
scale to maintain a unified appearance.
Reviewed by: Jennifer Prochazka Date: March 3, 2006
LANDSCAPING/STREETSCAPING/BUFFER
1. Provide a general note that 100% coverage of groundcover, decorative paving,
decorative rock, or a perennial grass is required in parking lot islands, swales and
drainage areas, the parking lot setback, rights-of-way, and adjacent property
disturbed during construction.
2. There is a sign shown on the landscape plan. Where is it proposed?
Reviewed by: Jennifer Prochazka Date: March 3, 2006
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a
Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow
Device, and installed as per City Ordinance 2394.
2. All BackFlow devices must be installed and tested upon installation as per City
Ordinance 2394.
ENGINEERING
1. Site Plan shows structures will be constructed over a public water line. The
water line will have to be relocated.
2. Designate which lines are public mains and which are service lines and provide
sizes. Engineered plan and profile drawings are required for all public
infrastructure and must meet BCS Unified Design Guidelines, Specifications, and
Details.
3. Show location of floodway limits on the Site Plan. It appears that you are
encroaching into the floodway. As shown, you will have to do a flood study to
show zero rise, get a variance from Zoning Board of Adjustments, and submit a
LOMR to FEMA.
Reviewed by: Carol Cotter Date: March 1, 2006
ELECTRICAL
Developer installs conduit per city specs and design.
City will provide drawings for conduit installation.
Developer pours transformer pad(s) per city specs and design.
Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to
sweido(a�cstx.gov
Developer provides load data for project.
Developer provides easements for electric infrastructure as installed for electric lines
To discuss any of the above electrical comments, please contact Gilbert Martinez at
979.764.6255. / Sam Weido at 979.764.6314. /Tony Michalsky at 979.764.3438.
Reviewed by: Sam Weido Date: 3-1-06