Loading...
HomeMy WebLinkAboutCorrespondence Page 1 of 1 Lindsay Boyer - Spring Creek Rezoning From: Lindsay Boyer To: joeschultz@texcon.net Date: 3/21/2006 1:13 PM Subject: Spring Creek Rezoning CC: Carol Cotter; wallace.phillips@verizon.net Joe, I wanted to get this information to you as soon as possible, and calling your office you were out. I will be headed out for lunch in a bit so am emailing instead. I was reviewing your revisions and there is still a problem with the floodplain area. Looking at the rezoning and the comp plan amendment, the boundaries were not the same. We processed the comp plan amendment only for the Residential Attached area which was indicated on the application. All of the notifications for Council and P&Z hearings were only for Residential Attached, no portion of the Floodplains and Streams were changed in this process. A portion of the C-1 rezoning includes areas that are designated as Floodplains and Streams at the south end of the property and we cannot take a rezoning forward with a positive recommendation for any area that is not in compliance with the comprehensive plan. If this is to move forward to the April 6 meeting, we must have revised maps (2 24 x 36s and 15 11x 17s) and metes and bounds by Friday which either exclude this portion that lies in the 100 year flood plain, or rezones it to A-O in compliance with the Comp Plan. If you would like to remove this portion from Floodplains and Streams, it will require a separate Comp Plan amendment. Staff would only support this change if you can show that the subject area does not lie within the 100 year flood plain.Taking this option separately will not hold up the remainder of the rezoning if you would like to exclude it and comp plan/rezone it at a later time. Please call me if you have any questions or wish to discuss this further. Thanks- Lindsay Lindsay B. Boyer Staff Planner City of College Station 1101 Texas Avenue S. College Station,Texas 77840 (979) 764-3570/ (979) 764-3496 Fax Iboyer@cstx.gov www.cstx.gov file://C:\Documents and Settings\lboyer\Local Settings\Temp\GW}00003.HTM 3/22/2006 0(9. - 8zo1ot TXCoN t"-6c TRANSMITTAL Date: March 20, 2006 To: Bridgette George Development Coordinator Development Services City of College Station From: Joe Schultz Texcon General Contractors Phone: (979) 764-7743 Subject: Revised Rezoning Map Spring Creek Gardens, Phase 3 College Station, Texas Remarks: Attached are 2 copies of the revised Rezoning Map. Our Response to Staff Comments is included. Planning Comment#1 —The proposed zoning boundary does not follow the previous zoning boundary due to updated survey data around the COE restricted area and the conservation zone and a change in the proposed right- of-way for the intersection of Decatur Drive and Arrington Road. Planning Comment#2 —The Crowley Tract has a COE permit which identified the wetlands, Navasota Ladies Tresses habitat and waters of the U.S. areas to protect. 70 acres of land was set aside for no development so that the remainder of the property could be developed. Let me know if you need anything else or have any questions.