Loading...
HomeMy WebLinkAboutCorrespondence Sent By: PK Engineering; 979 731 1500; Mar-6-06 9:30AM; Page 4/5 P Pledger Kalkomey, Inc. Bryan; Bryan; 7808 979-731-8000,979-731-1500(Fax) K Consulting Engineers www.pkengineenng.com March 6, 2006 Ms . Bridgette George City of College Station P.O. Box 9960 College Station, Texas 77842 Re : Final Plat Rock Prairie Baptist Church PK Job No. 37105-292 Dear Mrs . George, Enclosed please find the following for the referenced project : • Final Plat Application including all of the Minimum Submittal Requirements . Very Truly Yours, Tim 0. Wolff, E. I .T. tow@pkengineering.com TOW/jer Enclosure cc : Robert Payne Brenham • Bryan • Rosenberg s 200 4710-2J;PAY,r-Rack Pray is Bari V.m,C'S-Di-linin plat du. ti 7020 un P Pledger Kalkomey, Inc. Bryan,Texase 7808 979-731-8000,979-731-1500(Fax) K Consulting Engineers www.pkengine ring.corn / 2. ; C7 April 5, 2006 vCo Mr. Trey Fletcher City of College Station P.O. Box 9960 College Station, Texas 77842 Re: Final Plat Rock Prairie Baptist Church PK Job No. 37105-292 Dear Mr. Fletcher, Enclosed please find the following: • Signed applications; • Two (2) 24"x36" copies each of the revised Preliminary and Final Plats; • Fifteen (15) 11"x17" copies each of the revised Preliminary and Final Plats . A Mylar original and a digital copy of the Final Plat will be submitted after approval . The following items are addressed for Preliminary Plat : PLAN4ING (Trey Fletcher) � 1 . The access easement will be submitted separately. /2 . A signed application is attached. f3 . Typo corrected. v(4 . All items labeled in lieu of legend. t-' 5 . Okay. ENGINEERING (Josh Norton) 1 . Metes and bounds corrected. 2 . Okay. 3 . PUE changed to 30 ft . Brenham • Bryan • Rosenberg C^Documents and Settings\Guest\Local Settings\Temporary Internet Files\OLK36\CS-06-responsetocomments-2.doc Mr. Fletcher April 5, 2006 Page 2 ELECTRICAL (Sam Weido) Okay. ADDITIONAL CHANGES None. The following items are addressed for Final Plat : PLANNING (Trey Fletcher) 1 . The access easement will be submitted separately. 2 . A signed application is attached. 3 . Typo corrected. 4 . Okay. 5 . Heavier line weights used. 6 . "Owner (s) " added. 7 . Certifications modified. 8 . Ownership, etc . labeled. 9 . Okay. 10 . Okay. ENGINEERING (Josh Norton) 1 . Metes and bounds corrected. 2 . Okay. 3 . PUE changed to 30 ft . ELECTRICAL (Sam Weido) Okay. ADDITIONAL CHANGES None. Very Truly Yours, Steve E. Duncan, P.E. sed@pkengineering.com SED/jer Enclosure cc : Robert Payne 1151111111111111 CITY OF COLLEGE STATION Planning d'Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 9, 2006 TO: Steve Duncan via fax 731-1500 FROM: Trey Fletcher, Project Manager SUBJECT: ROCK PRAIRIE BAPTIST CHURCH (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, March 20th at 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for Thursday, April 6th at 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24"x36" copies of the revised final plat; Fifteen (15) 11"x17" copies of the revised final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to sgriffin@cstx.gov and awelsh@cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Willis S. Ritchey (4200 Rock Prairie Road East, College Station, TX 77840) Case file #06-00500024 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 1 TRANSMISSION VERIFICATION REPORT TIME : 03/08/2006 15: 45 NAME : COCS DEVELOPMENT SER FAX : 9797643496 TEL : 9797643570 SER. # : BROE2J341073 DATE,TIME 03/08 15:44 FAX NO. /NAME 973115000 DURATION 00:00: 56 PAGE(S) 04 RESULT OK MODE STANDARD ECM 4,1151114 CITY OF COLLEGE STATION Planning of Development.Service! 1101 Tcxaa Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 �-- -.. 4 MEMORANDUM _pik ',f March 9, 2006 TO: Steve Duncan via fax 731-1500 iiFROM: Trey Fletcher, Project Manager SUBJECT: ROCK PRAIRIE BAPTISIT CHURCH (PP) - Preliminary Plat Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, March 20th at 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for April 6th at 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24" x 36" copies of the revised preliminary plat; Fifteen (16) 11" x 17" copies of the revised preliminary plat; P Pledger Kalkomey, Inc. 7020 Coyote Run Bryan,Texas 77808 979-731-8000, 979-731-1500(Fax) K Consulting Engineers www.pkengineering.corn .5) 1 (L2 May 5, 2006 L\o Mr. Trey Fletcher City of College Station P.O. Box 9960 College Station, Texas 77842 Re: Final Plat Rock Prairie Baptist Church PK Job No. 37105-292 Dear Mr. Fletcher, Enclosed please find the following: • 24"x36" Mylar Final Plat signed by the surveyor and -r e owner A digital copy of the Final Plat was Emailed to you this date . Very Truly Yours, Steve E. Duncan, P.E. sed@pkengineering.com SED/jer Enclosure Brenham • Bryan • Rosenberg Snap 121731,share 1\2005\37105-292 PAYNE-Rock Prairie Baptist CS-08-mylar_f nal plat.doc