HomeMy WebLinkAboutStaff comments STAFF REVIEW COMMENTS NO. 2 Project: MDW CENTRE (SP) - 06-00500014 PLANNING 1. Please add this note to the site plan: "This entire property is considered as one building plot when it comes to parking and signage. If the total build out of this site is anticipated to be over 20,000s.f. /50,000s.f. The appropriate non-residential standards will apply. If you do not meet the 20,000s.f. / 50,000sf standards and the total build out exceeds this, the developer/property owner will be required to retrofit the development to meet Section 7.9.D.3. / 7.9.1 Additional Standards of the Unified Development Ordinance". 2. (FYI) If bollards are being proposed in the dumpster enclosure, please be aware that that their must be 12-feet of clearance for sanitation trucks to access. Please provide a dumpster detail. Reviewed by: Jennifer Reeves Date: April 11, 2006 ENGINEERING COMMENTS NO. 1 Project: MDW CENTRE (SP) — 06-00500014 ENGINEERING 1. You will need to submit a flood study to the CoCS, which would suffice for the LOMR, as well as all required FEMA applications, prior to receiving a Development Permit. Please include sanitary sewer creek crossing detail in the study. 2. You will need to submit a letter from the property owner, certifying that they will submit the LOMR and associated fees within 6 mo. of completing the proposed project. 3. Please submit a detailed grading plan and construction documents for the proposed retaining wall construction. One specific concern is the construction of the retaining wall footings in relationship to the floodway. 4. Due to the extensive work that will have to be done along the creek for the proposed retaining wall, please submit a letter certifying that the proposed work along the creek is covered under the USACE (Corp) General Nationwide Permit. 5. FYI: On several sheets in plan view there appears to be a floodway encroachment by the retaining wall, please revise as needed. Reviewed by: Josh Norton Date: April 19, 2006 41,1511111111 CITY OF COLLEGE STATION Planning er Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570/ Fax 979.764.3496 MEMORANDUM February 3, 2006 TO: Rabon Metcalf, RME, via fax 690.0329 k- FROM: Josh Norton, Graduate Civil Engineer SUBJECT: MDW Centre — Site Plan Engineering Comments The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval: One (1) copy of the revised construction plans. If there are comments that you are not addressing with the revised construction documents, please attach a letter explaining the details. If you have any questions or need additional information, please call Josh Norton or myself at 764-3570. Attachments: Staff review comments cc: Ron Cowe, (Mae Dean Wheeler) via fax 713. 355.1082 Case file # (06-00500014) ENGINEERING 1. (Sheet C1.1 and throughout) Remove "Floodway from Plat 3490/269". 2. (Sheet C2.1) Please elevate the sanitary sewer line at creek crossing as much as possible. 3. (Sheet C2.1) Please update creek crossing encasement detail note to verify that the steel encasement pipe will have a 3/8" wall thickness. Is steel encasement and ductile iron required? 4. (Sheet C2.1) Carrier pipe for bore is labeled as 6-in? 5. (Sheet C2.1) Please update bore detail note to verify that the steel encasement pipe will have a 3/8" wall thickness. Is steel encasement and ductile iron required? 6. (Sheet C2.2, C2.3, C2.4) Please verify floodplain and floodway elevations at each bridge crossing. I ran some calculations and found the floodplain and floodway elevations to be slightly higher than what you proposed. 7. (Sheet C2.2, C2.3, C2.4) In profile view your floodplain and floodway labeled elevations do not match your vertical scale, please revise. 8. The proposed saw cut of Lincoln and the existing driveway apron will not be allowed. Would you consider extending the needed main from the 16" already on the west side of Lincoln near the University intersection? 9. You may be able to locate you hydrant near the entrance off Lincoln in the existing easement if you can get your FDC within 150' of that location. 10. Due to upcoming changes in the Design Guidelines, PUEs are no longer needed for fire lines entering buildings. If you can get your FDC within 150' of your hydrant, you may be able to locate your hydrant and meters in the already existing easement along Lincoln. 11. Please revise water report accordingly. 12. Vehicular Bridge No. 2 appears to require off site improvement for construction of the retaining wall. Please provide permission from the off-site land owner for this construction. 13. How will the two vehicular bridges function as far pedestrian traffic? 14. I assume the sanitary sewer extension is being considered private infrastructure? 15. The temporary blanket easement dedication application requires a copy of the plat and a metes and bounds description (Application Items #3 and #4). 16. Donnie reviewed the SWPP and thought it was well put together. Donnie has attached the worksheet that the state uses to assess fines; there are a few comments for your future reference. 17. FYI: If this property subdivides in the future, extension of public utilities to each lot will be required. 18. FYI: Per Title 44 Part 65.3 of the CFR, the LOMR for this project has to be submitted within 6 mo. of completion of the improvements. Reviewed by: JOSH NORTON Date: FEBRUARY 3, 2006 2/3/2006, 2:48 PM GIFAX -> 9796900329 Page 1 of 5 p • CITY OF COLLEGE STATION \U Planning cs"I)evdnrment Services 1101 Texas Avenue, P.D. Box 9960 College Station, Texas 77842 Phone 979.764.3570/ Fax 979.764.3496 MEMORANDUM February 3, 2006 TO: Rabon Metcalf, RME, via fax 690.0329 FROM: Josh Norton, Graduate Civil Engineer SUBJECT: MDW Centre—Site Plan Engineering Comments The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval: One (1)copy of the revised construction plans. If there are comments that you are not addressing with the revised construction documents, please attach a letter explaining the details. If you have any questions or need additional information, please call Josh Norton or myself at 764-3570. Attachments: Staff review comments cc: Ron Cowe, (Mae Dean Wheeler) via fax 713. 355.1082 Case file #(06-00500014) 2/3/2006 2:48 PM GWFAX -> 9796900329 Page 2 of 5 ENGINEERING Sheet C1.1 and throughout) Remove"Floodway from Plat 3490/269". G2 (Sheet C2.1) Please elevate the sanitary sewer line at creek crossing as much as possible. 63: (Sheet C2.1) Please update creek crossing encasement detail note to verify that the steel encasement pipe will have a 3/8" wall thickness. Is steel encasement end ductile iron required? Loc �c-i►sC,R 3.01rrt tS U.1}1\,C4 pip MP'Niu ivgzg, (4 (Sheet C2.1) Carrier pipe for bore is labeled as 6-in? 1..)/p-5. (Sheet C2.1) Please update bore detail note to verify that the steel encasement pipe will have a 3/8" wall thickness. Is steel encasement and ductile iron required? j (Sheet C2.2, C2.3, C2.4) Please verify floodplain and floodway elevations at each bridge crossing. -t-ran some calcuhatia -floodplain and floodway - - • : :- .: - . - . a a a'ed. 7. (Sheet C2.2, 02.3, C2.4) In profile view your floodplain and floodway labeled elevations do not match your vertical scale, please revise. 1,s/p1 8. The proposed saw cut of Lincoln and the existing driveway apron will not be allowed. Would you consider extending the needed main from the 16" already on the west side of Lincoln near the University intersection? G9. You may be able to locate you hydrant near the entrance off Lincoln in the existing easement if you can get your FDC within 150' of that location. MSP 10. Due to upcoming changes in the Design Guidelines, PUEs are no longer needed for fire lines entering buildings. If you can get your FDC within 150' of your hydrant, you may be able to locate your hydrant and meters in the already _existing easement along Lincoln. Please revise water report accordingly. Vehicular Bridge No. 2 appears to require off site improvement for construction of the retaining wall. Please provide permission from the off-site land owner for this ��(''construction. (ir3 How will the two vehicular bridges function as far pedestrian traffic? 714-E••-1714-E••-1WI Lt. K el. b 4 ssume the sanitary sewer extension is being considered private infrastructure? pUgLIc, j,•:-The temporary blanket easement dedication application requires a copy of the plat and a metes and bounds description (Application Items#3 and#4). —THA^Al\s 16. Donnie reviewed the SWPP and thought it was well put together. Donnie has attached the worksheet that the state uses to assess fines; there are a few comments for your future reference. Oli. 17. FYI: If this property subdivides in the future, extension of public utilities to each lot will be required. 61 .18. FYI: Per Title 44 Part 65.3 of the CFR, the LOMR for this project has to be submitted within 6 mo. of completion of the improvements. Reviewed by: JOSH NORTON Date: FEBRUARY 3, 2006 • 01/29/2006 18:08 9797643x"" COCS DEVELOPMENT R PAGE 01/03 • 4ffill5111111111 CITY OF COLLEGE STATION Planning&Development Services 1.101 Tcxas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.349E MEMORANDUM January 30, 2006 TO: Rayhon Metcalf, P.E. Via fax 979.690.0329 FROM: Jennifer Reeves, Project Manager SUBJECT: MDW CENTRE (SP)-Site Plan Staff reviewed the above-mentioned site plan as requested. The following page ie a list of staff review comments detailing items that need to be addressed. The engineering comments will be returned later this week. Please address the comments and submit the following information for further staff review: One (1) revised site and Landscaping plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Ron Cowe, (Mae Dean Wheeler)Via Fax 713.355.1082 Case file#06-00500014 01/29/2006 18:08 9797643,—S COCS DEVELOPMEN' 7R PAGE 02/03 STAFF REVIEW COMMENTS NO. 1 Project: MOW CENTRE (SF') —06-00500014 PLANNING 1. (FYI) The Non-residential Standards information will need to be submitted for review and approved prior to issuarrce of a building permit. 1,2. Please provide a note on the site plan referencing the parking setback variance that ,,was granted form the Zoning Board of Adjustments. (Case file #05-214) /fir Please be aware that the proposed dumpster screening fence is required to match the building materials. it appears that a wooden fence is being proposed. Please not on the site pian; "That in the event that the dumpster screening has to be removed for utility maintenance that the property owner is responsible for the replacement of this wall/fence if the utility company has to get to a utility line at this location". Please show existing curbing along the drive isle located off of University Drive access point (Please be aware that this entire property is considered as one building plot when it comes to parking and signage. If the total build out of this site is anticipated to be over 20,000s.f. /50,000s.f. the appropriate non-residential standards will apply. If you do not meet the 20,000s.f. /50,000sf standards and the total build out exceeds this, the developer/property owner will be required to retrofit the development to meet Section 7.9.D.3. / 7.9.1 Additional Standards of the Unified Development Ordinance. tViAll end islands must be a solid ground cover, plantings or stamped dyed concrete or "avers. G7. The 8' pedestrian access bridge does not appear to have any railing. According to Section 1012 of the 2003 international Building Code guard rails are required. Picase provide the color and design of these rails as well. This will also apply to the guard rails at the corner of University and Lincoln. SEE S 4EE-mmC2,2. *C3.1 Please provide a detail of the proposed bike rack (color and design). 5E StM —r G3-1 LANDSCAPING/STREETSCAPiNG/BUFFER Wpc 9. Please show how you are meeting Section 7.9.H Parking lots 2. a. b. or c. It appears that you are maybe trying to meet Concept 3? (additional1800 s. f. of landscape area added to interior and end islands) Please keep in mind that the extra large end islands appear to be making up for the lack of interior islands as it is. You may have add additional green space elsewhere. The ends of the parking rows that are visible from the rights-of-way will need to be Pr. with 3-foot shrubs as well. 1N. The landscape legend shows that 60 Crepe Myrtles are being proposed. I could only identify 57. (pc) 15 CoYei Ec1 Reviewed by: Jennifer Reeves Date: 01-25-06 MISCELLANEOUS 1. Irrigation system must be protected by a Pressure Vacuum Breaker or a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. 01729/2006 18:08 97976434' COCS DEVELOPMENT PAGE 03/03 2. All Back Flow devices must be installed and tested upon installation as per City Ordinance 2394. FIRE Fire lanes need to be shown from the university Dr. East side, only one portion is currently shown. The fire lanes off Lincoln are correct. Wording of fire lane is "fire lane no parking tow away zone. The distance from fdc to fire hydrant is within 150 feet as the truck lays the hose, 6!Ensure fire flow calculations for building to support number of hydrant(s). Knox box required for building. Reviewed by: Jerry Duffey, Deputy Fire Marshal Dale: 1/25/06 ELECTRICAL. Developer installs conduit per city specs and design. City will provide drawings for conduit installation, Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. Developer pours transformer pad(s) per city specs and design. Developer installs pull boxes &secondary pedestals as per city specs and design. (pull boxes&secondary pedestals provided by the city). Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to sweidoncstx.gov . Developer provides load data for project. Developer provides temporary blanket easement for construction purposes. Developer provides casements for electric infrastructure as installed for electric lines. To discuss any of the above electrical comments, please contact Sam Weido at 979.764,6314. Reviewed by: Sam Weido Date: 1-26-06 CITY OF COLLEGE STATION Planning&Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM January 30, 2006 TO: Raybon Metcalf, P.E. Via fax 979.690.0329 FROM: Jennifer Reeves, Project Manager SUBJECT: MDW CENTRE (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The engineering comments will be returned later this week. Please address the comments and submit the following information for further staff review: One (1) revised site and Landscaping plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Ron Cowe, (Mae Dean Wheeler) Via Fax 713.355.1082 Case file #06-00500014 STAFF REVIEW COMMENTS NO. 1 Project: MDW CENTRE (SP) - 06-00500014 PLANNING ._.1. (FYI) The Non-residential Standards information will need to be submitted for review and approved prior to issuance of a building permit. ✓z. Please provide a note on the site plan referencing the parking setback variance that Jwas granted form the Zoning Board of Adjustments. (Case file #05-214) 3. Please be aware that the proposed dumpster screening fence is required to match the building materials. It appears that a wooden fence is being proposed. Please not on the site plan: "That in the event that the dumpster screening has to be removed for utility maintenance that the property owner is responsible for the replacement of this wall/fence if the utility company has to get to a utility line at this location". ✓4. Please show existing curbing along the drive isle located off of University Drive access point. —5. Please be aware that this entire property is considered as one building plot when it comes to parking and signage. If the total build out of this site is anticipated to be over 20,000s.f. /50,000s.f. the appropriate non-residential standards will apply. If you do not meet the 20,000s.f. / 50,000sf standards and the total build out exceeds this, the developer/property owner will be required to retrofit the development to meet Section 7.9.D.3. / 7.9.1 Additional Standards of the Unified Development Ordinance. - 6. All end islands must be a solid ground cover, plantings or stamped dyed concrete or pavers. 74'. The 8' pedestrian access bridge does not appear to have any railing. According to Section 1012 of the 2003 International Building Code guard rails are required. Please provide the color and design of these rails as well. This will also apply to the guard rails at the corner of University and Lincoln. . Please provide a detail of the proposed bike rack (color and design). LANDSCAPING/STREETSCAPING/BUFFER 9. Please show how you are meeting Section 7.9.H Parking lots 2. a. b. or c. It appears that you are maybe trying to meet Concept 3? (additiona11800 s. f. of landscape area added to interior and end islands) Please keep in mind that the extra large end islands appear to be making up for the lack of interior islands as it is. You may have to add additional green space elsewhere. 1/10. The ends of the parking rows that are visible from the rights-of-way will need to be screened with 3-foot shrubs as well. J11. The landscape legend shows that 60 Crepe Myrtles are being proposed. I could only identify 57. Reviewed by: Jennifer Reeves Date: 01-25-06 MISCELLANEOUS 1. Irrigation system must be protected by a Pressure Vacuum Breaker or a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. 2. All Back Flow devices must be installed and tested upon installation as per City Ordinance 2394. FIRE 1. Fire lanes need to be shown from the university Dr. East side, only one portion is currently shown. The fire lanes off Lincoln are correct. Wording of fire lane is "fire lane no parking tow away zone. 2. The distance from fdc to fire hydrant is within 150 feet as the truck lays the hose. 3. Ensure fire flow calculations for building to support number of hydrant(s). 4. Knox box required for building. Reviewed by: Jerry Duffey, Deputy Fire Marshal Date: 1/25/06 ELECTRICAL Developer installs conduit per city specs and design. City will provide drawings for conduit installation. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. Developer pours transformer pad(s) per city specs and design. Developer installs pull boxes & secondary pedestals as per city specs and design. (pull boxes & secondary pedestals provided by the city). Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to sweidocstx.qov cni . Developer provides load data for project. Developer provides temporary blanket easement for construction purposes. Developer provides easements for electric infrastructure as installed for electric lines. To discuss any of the above electrical comments, please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 1-26-06