HomeMy WebLinkAboutCorrespondence RST OFFICE BOXALF925ENGINEERING ‘9t.(15(979) 90-0329 Home
COLLEGE STATION,TEXAS 77842 (979)690-029 FAX `',
(979)219-4174 - CELL Ad
\\\ EMAIL: rmengineer@juno.com
June 22,2006
Josh Norton, E.I.T.
Graduate Engineer
City of College Station
1101 Texas Avenue South
College Station, TX 77842
RE: MDW Centre,Phase One
1200 University Drive, East, College Station,TX
Transmittal Letter for Revised Permit Set Submissions
RME No. 197-0268
Dear Josh:
Please find attached the following sets of construction plans for the above referenced project.
These plans are ready for yours and Jennifer Reeve's approval.
7—Copies of the revised Construction Drawings;
1 —Copy of the revised Civil Site Plan(sheet C1.1);
1 —Copy of the revised Landscape Plan(sheet C 1.6);
3 —Extra copies of the revised Construction Drawings—RETURN TO RME;
Please do not hesitate to call if you have any questions.
Sincerely'114/1P—__
/
Rabon A. Metcalf,P.E.
rmengineer@verizon.net
CD 1-197-0268-L08 Page- 1
RABONF M ETCALF ENGINEERING
POST OFFICE BOX 9253 (979)690-0329 - Ho me()
COLLEGE STATION,TEXAS 77842 (979)690-0329 FAX
(979)219-4174 - CELL
EMAIL: rmengineer@juno.com
a
.
June 8, 2006
Josh Norton, E.I.T.
Graduate Engineer
City of College Station
1101 Texas Avenue South
College Station, TX 77842
RE: MDW Centre,Phase One
1200 University Drive, East, College Station,TX
Transmittal Letter for RME Revision Mark No. 1
RME No. 197-0268
Dear Josh:
Please find attached the following set of revised construction drawings for the above referenced
project. The revised drawings illustrate additional parking, desired by the developer, which is
identified by a red revision cloud. Only the affected sheets from the plan set are included.
Please do not hesitate to call if you have any questions.
Sincerely,
Rabon A. Metcalf, P .
rmengineer@verizon. et
CD1-197-0268-L07 Page- 1
lisof
CITY OF COLLEGE STATION
Planning dr Development Services
1101 Texas Avenue,P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570/Fax 979.764.3496
MEMORANDUM
April 19,2006
TO: Raybon Metcalf, P.E. Via fax 979.690.0329
FROM: Jennifer Reeves,Project Manager
SUBJECT: MDW CENTRE (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. The next submittal
will be the third and final review by staff for this round of reviews. If all items have not
been addressed on the next submittal, another $200 processing fee will need to be
submitted for the subsequent set of three (3) reviews. Please address the comments
and submit the following information for further staff review:
One (1) complete set of construction documents for the proposed
development with the revised site and landscaping plans attached.
One (1) 11x17 grading and erosion control plan
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call me at 764-3570.
Attachments: Staff review comments
cc: Ron Cowe, (Mae Dean Wheeler) Via Fax 713.355.1082
Case file #06-00500014
VO)
Architecture/Development
TRANSMITTAL July 24,2006
TO: City of College Station
Development Services
Attn: Jennifer Reeves
1101 Texas Avenue
College Station,TX 77842
FROM: Kristy Walker/Jim Powell
PROJECT: Red Lobster/MDW Center—College Station
Copies Sheet No. Description
1 A8 Exterior Elevations
1 A9 Exterior Elevations
1 A8 Color Elevations
1 A9 Color Elevations
Jennifer,
Enclosed you should find the required exterior elevations for Red Lobster at the MDW
Center at Lincoln and University for review.The plan review fee of$200 is also attached.
Please contact myself or Jim Powell 972-239-8884 if there are any questions.
Thank You,
:.f 4 . t2i€L 1,
Kri ty W•O'er
Project Coordinator
GHA Architects
Real Estate
Development Services
Site Development
Architecture
Construction Manag.
Document2
Gerdes•Henrichson&Associates
14110 Dallas Parkway•Suite 100•Dallas,TX•75254
Phone:(972)239-8884•Fax:(972)239-5054