HomeMy WebLinkAboutEngineering Documents JUL-10-2006 14:37 From:BRAZOS UALLEYUTILITI 9797750276 To:7643489 P.2'2
SOS
VALLEY UTILITIES, INC. o P OCA
P.O. BOX 4088
BRYAN,TEXAS 77805
(979)779.2609
FAX(979) 775-0276
LETTER OF COMPLETON
CITY ENGINEER DATE; 7/3/06
CITY OF COLLEGE STATION
COI-LEGE STATION, TEXAS
RE: COMPLETION OF Riviera Day Spa, Inc. - 2821 Rock Prairie Road E.
Dear Sir:
The purpose of our letter is to request that the following listed improvement'be approved and accepted as being
constructed under city inspection and completed according to plans and specifications as approved and required by the City
of College Station,Texas, This approval and acceptance by the City is requested in order that we may finalize any sub-
contracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed
below does herby void the letter of guarantee for the listed improvements an the above referenced project.
The one year warranty is hereby affirmed and agreed to byrazos lle U i ities I and their sub-contractors aS
indicated by signatures below.
WORK COMPLETED DATE
12X6 TS & V 6-19-06
Fire Hydrant 6-19-06
1 1/2 Lond Double Meter Sere. 6-19-06
6" Sewer Tap 6-19-06
Riviera Day Spa, Inc.
Owner � 4c 0 a �roN
y1 C7{�` 7/10 70 Address; I OO -t.aTh_o r� .
tility Representatives) �'_ '� • //WV"
,C i• A E& APPROVAL Sub-Contractor! Brazos Valley Utilities,Inc,
Address: P.O. Box 4088: Bryan, Texas 77805
City Engineer
7cL'
By: W,A. Haveron
jprrl
c/////'
(irff CITY INFRASTRUCTURE
CITY OF COLLEGE STATION INSPECTION NOTICE
Planning cf Development Servicer
Date: May 9, 2006
To: Bob Mosley ( 2 )
From: Deborah Grace
RE: Riviera Day Spa
Location: 2821 Rock Prairie Rd
RI Public Water Lines/Fire Hydrants
Public Sanitary Sewer
Public Storm Sewer
Public Streets 171 Engineer's Estimates Attached
Public Detention Facility n Construction Plans Attached
EXI Driveway Connection to Public Street Site Plan Attached
Private Construction within easement
No Inspection Required
Comments:
\\docserver\vol l\group\htltr\pzltr\prod\pz2006\p0013487.doc
ENGINEERS OPINION OF COST
FOR THE PROPOSED
RIVIERA DAY SPA
Item Quantity Unit Cost Total
Furnish and install fire hydrant unit including 1 $2,100 $2,100
mobilization, excavation, thrust blocking,
trench safety, and backfill, complete and in
place.
s ® A0-
®stsssssasaseot5,om®.��3�
®® BRETT A.M� cC L i
eases®as®ss000moo II,'f'
1Ti -017„, ,,,82553.0.,,,; f1'
/kap, ,,.�E� of
1