Loading...
HomeMy WebLinkAboutCorrespondence TRANSMISSION VERIFICATION REPORT TIME : 02/27/2006 22: 12 NAME : COOS DEVELOPMENT SER FAX : 9797643496 TEL : 9797643570 SER.# : BR0E2J341073 DATE,TIME 02/27 22:11 FAX NO. /NAME 98221763 00:01: 20 05 OK STANDARD ECM 2-OYU V-4 r COIlttri,STAXION 14r44 Diot4inint Se74kes' 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 FACSIMILE COVER SHEET Date:3\ --- -15---OL7 # of pages including cover: If you did not receive a complete fax,please call our office immediately for a new transmittal. TOV- --10S1Ckackf KNOT FAX; COMPANY: RE: A& \woo F COO P COMPANY: City of e Station From: Alan Gibbs To: fred@klingeng.com Date: 2/16/2006 5:36:04 PM Subject: Fwd: Gateway Crossing -ZBA Variance Fred, We will be sending out the advertisement for the subject ZBA item tomorrow. To date I have not recieved the following requirements. Alan >>>Alan Gibbs 1/25/2006 12:24:16 PM >>> Fred, Please provide the following items: 1. 20 sets of the"site plan"to include in ZBA packets. 2. Letter specifically addressing items in the Ch. 13- Flood Hazard Protection Ordinance, Section 6.A.(1) - (3) as well as C.(5) (a)-(d). Some of these items may be redundant, however, each needs to be addressed. All items need to be complete by February 20th to make the March 7th ZBA meeting which this is tentatively slated for. Alan P. Gibbs, P.E. Sr. Asst. City Engineer- Development Public Works Department City of College Station P. O. Box 9960 College Station, Texas 77842 Ph: (979) 764-3570 Fx: (979) 764-3496 agibbs cstx.gov www.cstx.gov From: Alan Gibbs To: Paine, Fred Date: 1/17/2006 8:27:18 AM Subject: Re: Gateway Phase 3 &4 Creek Crossing Fred, You are correct regarding the Preliminary Plat and constructing the waterline and the crossing at the same time is okay. Alan >>>"Fred Paine" <fred@klingeng.com> 1/16/2006 8:38 AM >>> Thanks for your response Alan. I will prepare the ZBA variance request and submit this week. There is an approved preliminary plat for the property as of May 2003 (please refer to your files). Waterline & Driveway/drainage structure are planned to be constructed at the same time. Will this be an issue? Fred Paine KLING ENGINEERING &SURVEYING Consulting Engineers . Land Surveyors 4101 Texas Avenue, Suite A Bryan, Texas 77802 Telephone 979/846-6212 Fax 979/846-8252 Original Message From: "Alan Gibbs" <Agibbsna cstx.gov> To: "Fred Paine" <fredna klingeng.com> Cc: "Stewart Kling" <stewart(cklingeng.com>; "David Scarmardo" <david( scarmardofoods.com> Sent: Friday, January 13, 2006 5:58 PM Subject: Re: Gateway Phase 3&4 Creek Crossing > Fred, > 1. The City will recognize the submitted report as technically > satisfying zero rise per our discussion with Saleem Ashroff. Subsequent > conversations with Karl Watts will not permit the City to recognize this > method as zero rise in the future. > 2. Floodway encroachments requirements are listed in College Station > Code Ch.13 Sec 5. In short, a variance to ZBA is required which is > described in Section 6. Provide a application explaining the criteria > listed in A. and C.(5). > 3. The subject tract needs to be platted in conjuction with this > Development Permit. Specifically, the preliminary plat must be approved > before the DP can be issued. >4. The Development Permit must be first issued for the waterline or >the waterline and the crossing -as the waterline is required in > conjunction with the platting. > 5. A Letter of Map Revision is required in accordance with Code of e > Federal Regulations 44 65.3. Floodway revisions must be in accordance >with 65.7. > Let me know if you have additional questions. >Alan P. Gibbs, P.E. > Sr. Asst. City Engineer- Development > Public Works Department > City of College Station > P. 0. Box 9960 > College Station, Texas 77842 > Ph: (979)764-3570 > Fx: (979) 764-3496 > agibbs a(�.cstx.gov >www.cstx.gov CC: Kling, Stewart; Scarmardo, David To Whom It May Concern: This same letter was mailed to you several days ago. I noticed the letter and map did not correspond so I am resending it. Sorry for the confusion.