HomeMy WebLinkAboutStaff Report STAFF REPORT
Project Manager: Lindsay Boyer Report Date: March 8, 2006
Email: Iboyer@cstx.gov Meeting Date: April 6, 2006
Project Number: 06-00500004
Item: Presentation, possible action, and discussion on a Preliminary Plat for
Crescent Pointe Phase 2-4 consisting of 16 lots on 137.14 acres located at 300
University Drive East in the general vicinity of Copperfield Parkway between
University Drive East and State Highway 30.
Applicant: Stewart Kling, engineer for the owner
Staff Recommendations: Staff recommends approval of the preliminary plat
with the condition that Staff Review Comments #3 are met.
Item Summary: This plat is a preliminary plat for Phase 2-4 of Crescent Pointe
Subdivision. The plat includes 16 lots on 137.14 acres for a variety of proposed
uses, including: office, commercial, and multi-family housing.
Comprehensive Plan Considerations: The subject property is designated as
Planned Development on the City's Comprehensive Land Use Plan. The plat
includes property with frontage on University Drive East and Harvey Road, both
major arterials, and Copperfield Parkway, a minor arterial.
This property is part of the 30/60 Small Area Plan which identified this area for
Mixed Use Development. In 2003, the Mixed Use Study reclassified this area as
Planned Development. The 30/60 Plan, listed a variety of uses that would be
appropriate in this area: office, commercial, clean industrial, and higher density
single family and multi-family housing.
This plat is in compliance with the approved Master Plan as well as all
subdivision regulations.
Future driveways along Copperfield Parkway and Crescent Pointe Parkway will
be determined at site plan and must comply with all driveway separation
requirements.
Item Background: This property was annexed in 1979 and subsequently zoned
M-1, Light Industrial. Phase 1 of Crescent Pointe was platted in 2005. This plat
included 4.2 acres divided into 4 lots at the southwest corner of Copperfield
Parkway and Crescent Pointe Parkway.
A Master Plan was approved on this property in 2003. In 2005, the Master Plan
was approved again after the expiration of the previous plan. This Master Plan
has been submitted for an amendment, as well as a rezoning. Additional
development in this area includes the Citibank, formerly First National Bank
building.
Budgetary & Financial Summary: None
Related Advisory Board Recommendations: This property was discussed by
the Parks and Recreation Advisory Board on March 7, 2006. Their
recommendation to the Planning and Zoning Commission is for a 5.05 acre park
located in Phase 2, east of Copperfield Parkway on property with frontage on
Crescent Pointe Parkway. Additionally, unless the park is constructed by the
developer, an additional $292 per Dwelling Unit is required in Park Development
Fees at the time of Building Permit.
Commission Action Options: The Commission has final authority over the final
plat. The options regarding the final plat are:
• Approval with conditions;
• Approval as submitted; or
• Denial.
INFRASTRUCTURE AND FACILITIES
Water Service: The subject property is supported by a 12-in water main
which runs along Copperfield Dr, an 8-in water main which runs along
Crescent Pt. Pkwy, and a 12-in water main which runs along SH 30.
Sewer Service: The subject property is supported by an adjacent 8-in
and a 12-in sanitary sewer main.
Street(s) required for plat: none
Streets/Access: The subject property takes access off SH 30, SH 60,
Copperfield Dr. and Crescent Pt. Pkwy.
Off-site Easements required for plat: Easements may be required for
storm sewer and/or sanitary sewer.
Drainage: The subject property is located in the Carter's Creek
Drainage Basin. The development is required to comply with the City's
Drainage Policy.
Flood Plain: None on-site
Oversize request: See Budgetary and Financial Summary Section.
Impact Fees: None
Parkland Dedication Fees: See Related Advisory Board
Recommendations
Supporting Materials:
1. Small Area Map (SAM) and Aerial Map
2. Application
3. Copy of Preliminary Plat (provided in packet)
4. Copy of Master Development Plan (see Case #06-25)
5. Staff Review Comments #3
STAFF REPORT
This item is a preliminary plat for the remained of the
Crescent Pointe subdivision, consisting of 16 lots on 137.14
acres in 3 additional phases. Phase one located at the
southwest intersection of Crescent Pointe Parkway and
Copperfield Parkway was platted in 2005. This preliminary
plat will serve as the preliminary for all of the property left in
the Crescent Pointe subdivision, and subsequent final plats
will be brought to the commission for approval.
The preliminary plat is in compliance with all minimum
subdivision requirements, the Comprehensive Plan, and
current and proposed zoning district dimensions. The plat
also includes a 5.05 acre park in Phase 2 that was
recommended by the Parks and Recreation Board in early
March.