Loading...
HomeMy WebLinkAboutStaff Report STAFF REPORT Project Manager: Lindsay Boyer Report Date: March 8, 2006 Email: Iboyer@cstx.gov Meeting Date: April 6, 2006 Project Number: 06-00500003 Item: Public hearing, presentation, possible action, and discussion on a rezoning for Crescent Pointe Subdivision consisting 137.14 acres located at 300 University Drive East in the general vicinity of Copperfield Parkway between University Drive East and Harvey Road from M-1, Light Industrial to a combination of C-1, General Commercial, A-P, Administrative Professional, and R-4, Multi-Family. Applicant: Stewart Kling, engineer for the owner Staff Recommendations: Staff recommends approval of the rezoning if the amendment to the Master Plan is approved with the condition that no fence or wall be built between the park and the adjacent R-4 lot (Lot 1, Block 3, Phase2) located on Crescent Pointe Parkway. Item Summary: This rezoning request is being brought forward by the owner in conjunction with an amendment to the Master Plan for this property. Originally this property was designated to develop under a P-MUD Zoning District. According to the applicant, they have been unable to market the property with this zoning classification and are seeking to establish standard zoning classifications to meet the same intent of the mix of uses on this property. The Master Plan did not change the type and location of uses approved on the 2005 Master Plan and include office, retail, apartments, and townhomes. This property is surrounded by property that is zoned M-1, Light Industrial to the west, developed as Texas A&M, and undeveloped A-O, Agricultural Open, and PDD, Planned Development District to the east. Comprehensive Plan Considerations: The Land Use Plan designates this area as Planned Development. The property was included in area 4A of the 30/60 Small Area Plan which originally identified this area for Mixed-Use and made the following statement: The area should be reflected as mixed use, with an emphasis on uses such as office, commercial, clean industrial, and higher density single family and multifamily housing. Low density housing should be discouraged. Housing that appeals to professionals should be encouraged. The PDD district could be used to facilitate design innovation and more intense commercial uses. Standard zoning districts that permit high density single family, multi-family, clean industrial, offices, and C:IDocuments and Settings VboyerlDesktop\StaffReport-RZ.DOC Created on 3/28/2006 10:35 AM commercial uses that are conducive to tourism would also be appropriate in this area. In March 2003, the Mixed Use Opportunity changed the Mixed Use Designation in this area to Planned Development, which it has since retained. The Thoroughfare Plan designates Copperfield Parkway as a minor arterial. Construction has been completed by the City. For consideration of the multi-family rezonings, currently there are: 1100 acres designated on the Comprehensive Plan 1335 acres zoned multi-family 798 acres zoned and developed for multi-family development 213 acres zoned for multi-family and undeveloped 183 acres zoned but developed for uses other than multi-family Current occupancy rates for multi-family: 90.6% * *Source: Texas A&M Real Estate Center This property was discussed by the Parks and Recreation Advisory Board on March 7, 2006. Their recommendation to the Planning and Zoning Commission is for a 5.05 acre park located east of Copperfield Parkway with frontage on Crescent Pointe Parkway. The Board is also concerned with park frontage and access from the adjacent residential development. They would like for the park to be visible and accessible from the residences with no fences impeding access to the park. This property is surrounded by property designated for Texas A&M on the west and Planned Development and Single-Family Residential, High Density to the east. It is bound to the north and south by roads. This rezoning will be in compliance to an approved Master Plan if the amendments to the Master Plan have been approved prior to this item. All of the zonings meet minimum lot dimensions for their respective zones. Item Background: The subject property was annexed in 1979 and subsequently zoned M-1, Light Commercial. Portions of this property have been platted as Crescent Pointe, developing as the new Citibank, formerly First National Bank, building. Also platted is Crescent Pointe Phase 1, which is a plat for approximately 4 acres at the southwest corner of Copperfield Parkway and Crescent Pointe Parkway. One of the lots is currently under site plan review for a law office. Related Advisory Board Recommendations: N/A C:IDocuments and SettingsllboyerlDesktop1Staff Report-RZ.DOC Created on 3/28/2006 10:35 AM Infrastructure and Facilities: Water: The subject property is supported by a 12-in water main which runs along Copperfield Dr, an 8-in water main which runs along Crescent Pt. Pkwy, and a 12-in water main which runs along SH 30. Sewer: The subject property is supported by an adjacent 8-in and a 12-in sanitary sewer main. Streets: The subject property takes access off SH 30, SH 60, Copperfield Dr. and Crescent Pt. Pkwy. Off-site Easements: Easements may be required for storm sewer and/or sanitary sewer. Drainage: The subject property is located in the Carter's Creek Drainage Basin. The development is required to comply with the City's Drainage Policy. Flood Plain: None on-site Oversize request: See Budgetary and Financial Summary Section. Impact Fees: None Commission Action Options: The Commission acts as a recommending body on the question of rezoning, which will be ultimately decided by City Council. The Commission options are: 1. Recommend approval of rezoning as submitted; 2. Recommend denial; 3. Table; or, 4. Defer action to a specified date. Supporting Materials: 1. Small Area Map (SAM) and Aerial Map 2. Application 3. Rezoning Map (included in packet and on wall) C:IDocuments and Settingsllboyer1Desktop\Staff Report-RZ.DOC Created on 3/28/2006 10:35 AM NOTIFICATION: Legal Notice Publication(s): The Eagle; 3-21-06 and 4-11-06 Advertised Commission Hearing Dates(s): 4-6-06 Advertised Council Hearing Dates: 4-27-06 Number of Notices Mailed to Property Owners Within 200': 25 Response Received: None as of date of staff report C:IDocuments and SettingsllboyerlDesktop\Staff Report-RZ.DOC Created on 3/28/2006 10:35 AM