Loading...
HomeMy WebLinkAboutCorrespondence CITY OF COLLEGE STATION 17 January 2007 Veronica Morgan Mitchell & Morgan 511 University Drive East, Suite 204 College Station, Texas 77840 RE: Wolf Pen Creek Condominiums CUP Extension Dear Veronica: Per your request, please accept this letter as an extension of the Conditional Use Permit (CUP) for the Wolf Pen Creek Condominiums project located at 305 Holleman Drive East. According to Section 3.13 G of the Unified Development Ordinance, this extension is valid for a six-month period. Please feel free to contact me at 979.764.3570 should you have questions or need additional information. Sincerely, Lance Simms, CBO Acting Director of Planning and Development Services the heart of the Research Valley P.O. BOX 9960 1 101 TEXAS AVENUE COLLEGE STATION•TEXAS•77842 979.764.3510 www.cstx.gov MITCHELL M MORGAN January 11, 2007 Lance Simms, CBO Acting Director of Planning & Development Services City of College Station, Texas 77840 Re: Wolf Pen Creek Condominiums Conditional Use Permit Request for Extension Dear Lance: On February 23, 2006 the City of College Station City Council approved a Conditional Use Permit for the above reference project. We are currently working on construction plans for this project and will have plans in for permitting prior to February 23, 2007 but may not have obtained a construction permit prior to this date. As we understand, we must be under construction prior to February 23, 2007 or request an extension to the Conditional Use Permit. Because of the unknowns in the timing of receiving a permit we would like to request an extension of the Conditional Use Permit. Please let us know if you have any questions. As always thank you very much for your help. Si, -rely, la Veronica J. :,. Mor 1.arr, P.E., C.F.M. Managing Partner cc: Jim Stewart Matt Brown Jane Kee • 511 UNIVERSITY DRIVE EAST,SUITE 204 • COLLEGE STATION,TX 77840• T 979.260.6963• F 979.260.3564 CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS info@mitchellandmorgan.corn • www.mitchellandmorgan.corn Trey Fletcher-WPC Condos Page 1 From: Bridgette George To: Trey Fletcher Date: 3/29/2006 11:30 am Subject: WPC Condos I called Jane about the required application and fees and after conversing with her for a while, I've agreed to Jane's request to hold off on submitting the application and fees because she said it would change after the meeting with the P&Z. I'll put a note in the system that they are due and we'll make sure to collect them before we schedule them for DRB. Bridgette George'04 Development Coordinator CITY OF COLLEGE STATION Planning & Development Services `Building a Better Community with You* www.cstx.gov Lisa Lindgren- Re: AD TO RUN Tuesda 'ebruary 7, 2006 Page 1 From: Bridgette George To: Lisa Lindgren Date: 2/3/2006 1:59:50 PM Subject: Re: AD TO RUN Tuesday, February 7, 2006 No biggie, I guess, but I think the ad needs to remove"the" in front of WPC, OR, add "District" . . . it sounds like they're proposing residential in the creek. Bridgette George'04 Development Coordinator CITY OF COLLEGE STATION Planning &Development Services *Building a Better Community with You* www.cstx.gov >>> Lisa Lindgren 03-Feb-06 11:19 AM >>> Jeana: This ad needs to run on Tuesday, February 7, 2006. Please fax proof to 764-3496. Thanks and have a good weekend! Lisa Lindgren Staff Assistant City of College Station Planning &Development Services 1101 Texas Avenue College Station, Texas 77840 979-764-3783 Ilindgrenccstx.gov www.cstx.aov CC: Trey Fletcher Gr. iffilliii111114 CITY OF COLLEGE STATION Planning&Development Services CITY OF COLLEGE STATION PLANNING & DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979)764-3570 / Fax (979)764-3496 TO: VERONICA MORGAN MITCHELL&MORGAN ENGINEERS RE: WPC CONDOS FAX: 979-260-3564 FROM: Lisa Lindgren, Staff Assistant DATE: January 30, 2006 RE: Agenda&Staff Report P&Z Meeting, February 2, 2006 Following this coversheet is a copy of the Staff Report that was prepared for the above referenced project. Please keep in mind that staff's responsibility is to provide the Planning & Zoning Commission with all pertinent facts of a development case, but that staff is not acting as an advocate for the applicants. Therefore, it is in the applicant's best interest to send a representative to the Planning & Zoning Commission meeting to speak on behalf of the proposal. This item is scheduled for the February 2, 2006, Planning & Zoning Commission Meeting. This meeting will begin at 7:00 P.M. in the City Hall Council Chambers., 1101 Texas Avenue. I have included a copy of the agenda for this meeting. Please contact our office at (979) 764-3570 if you should have any questions. Thanks. (11 CITY OF COLLEGE STATION Planning t Development Services CITY OF COLLEGE STATION PLANNING & DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979)764-3570 / Fax (979)764-3496 TO: JANE KEE IPS GROUP RE: WPC CONDOS FAX: 979-846-9259 FROM: Lisa Lindgren, Staff Assistant DATE: January 30, 2006 RE: Agenda& Staff Report P&Z Meeting, February 2, 2006 Following this coversheet is a copy of the Staff Report that was prepared for the above referenced project. Please keep in mind that staff's responsibility is to provide the Planning & Zoning Commission with all pertinent facts of a development case, but that staff is not acting as an advocate for the applicants. Therefore, it is in the applicant's best interest to send a representative to the Planning & Zoning Commission meeting to speak on behalf of the proposal. This item is scheduled for the February 2, 2006, Planning & Zoning Commission Meeting. This meeting will begin at 7:00 P.M. in the City Hall Council Chambers., 1101 Texas Avenue. I have included a copy of the agenda for this meeting. Please contact our office at(979) 764-3570 if you should have any questions. Thanks. (iliff11511114 CITY OF COLLEGE STATION Planning&Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570/ Fax 979.764.3496 MEMORANDUM January 11, 2006 TO: Mr. Jim Stewart via fax: 694-3774 FROM: Trey Fletcher, Project Manager SUBJECT: WPC CONDOS (CUPU) - Concept Plan Staff reviewed the above-mentioned concept plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Tuesday, January 17, 2006 at 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for February 2, 2006 at 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24"x36" copies of the revised concept plan; Twelve (12) 11"x17" copies of the revised concept plan; Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call me or Carol Cotter at 979.764.3570. Attachments: Staff review comments cc: Ms. Jane Kee, IPS Group via fax: 846-9259 Mr. Bart Munroe, via mail to: 7553 River Ridge Drive, College Station, TX 77845 Ms. Veronica Morgan, Mitchell & Morgan via fax: 260-3564 Case file #06-00500001 STAFF REVIEW COMMENTS NO. 1 Project: WPC CONDOS (CUPU) — 06-00500001 PLANNING 1. Given the level of detail in the Concept Plan submitted in conjunction with the Conditional Use Permit application, adherence to the provisions within Section 5.6.A Wolf Pen Creek (WPC) may affect the site plan, which includes the following: • Development Criteria; • Dedication/Development of Drainage and Pedestrian Ways; 1. The Concept Plan appears to fulfill Subsection A of this section. • Fill Materials; • Lighting; • Solid Waste; • Relationship of Buildings to the Site; 1. This section should be integrated into the Concept Plan to the greatest extent practicable. • Relationship of Buildings to the Adjoining Area; • Building Design; • Miscellaneous Structures and Street Hardware; • Landscaping (as reference below); • Signs; and, • Maintenance. The proposed parking plan must be revised. Counting both garage spaces and drive spaces is not acceptable. Required and surplus parking provided should be in designated areas, not behind spaces counted within garages that may or may not be accessible to the residents. The process for this application will be as follows: Planning & Zoning Commission — recommend action on CUP City Council —final action on CUP Design Review Board —action* on detail site plan *The Planning & Zoning Commission and City Council will be asked of their expectation for review of the detailed site plan as this is a Conditional Use Permit. Therefore, "action" taken by the DRB may be regarded as "final or "as "recommendation" resulting in the detailed site plan being reviewed by Planning & Zoning Commission and City Council. 4. As a multi-family development, parkland dedication requirements must be addressed by the Parks & Recreation Advisory Board prior to platting of the property and site plan approval. 5. Provide a general note that all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Reviewed by: Trey Fletcher Date: January 11, 2006 LANDSCAPING/STREETSCAPING/BUFFER 1. With the concept plan level of detail, no landscape plan was provided for review. However, should the Conditional Use Permit be granted for this use, landscaping provisions must comply with Section 5.6.A.10 Landscaping. Requirements within the referenced section are in addition to typical landscaping requirements found in Sec. 7.5 of the UDO. 2. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights-of-way, and adjacent property disturbed during construction. Reviewed by: Trey Fletcher Date: January 11, 2006 MISCELLANEOUS 1. Irrigation system must be protected by a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. ENGINEERING — 1. Sanitary sewer will have to be relocated and easement abandoned prior to Site Plan approval. �%c :'wtirr .� �e+�— e 2. Fill permit required for fill in floodplain. 3. Turnarounds for fire and sanitation required on northwest and northeast drive aisles. 4. Depending on depth of relocated sewer line, proposed 15' PUE may need to be 20' wide. 5. Property needs to be platted. 6. With platting, easements are required on the along the rear of all platted lots. This is not shown. Reviewed by: Carol Cotter Date: January 9, 2006 FIRE 1. This concept plan level of detail does not reflect many of the fire related requirement and may result in changes reflected in the detailed site plan. 2. Is this a gated community? If so, additional requirements apply. 3. All of the drive aisles as depicted shall be shown as Fire Lanes. 4. Fire flow calculations required for detailed site plan and may impact concept plan. Reviewed by: Jerry Duffey Date: January 11, 2006 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. City will provide drawings for conduit installation. 3. Developer pours transformer pad(s)per city specs and design. 4. Developer installs pull boxes & secondary pedestals as per city specs and design.(pull boxes & secondary pedestals provided by the city). 5. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to gmartinez(a cstsx.qov 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 9. To discuss any of the above electrical comments, please contact Gilbert Martinez at 979.764.6255. /Sam Weido at 979.764.6314. /Tony Michalsky at 979.764.3438. Reviewed by: Gilbert Martinez/Tony Michalsky Date: 1-11-06 F4 Page 1 of 1 Trey Fletcher CUP in WPC application question r.4 C' Le From: Molly Hitchcock To: Jane Kee; Natalie Date: 12/8/2005 5:22 PM Subject: CUP in WPC application question Afternoon! In response to your question of whether or not a conceptual site plan could be submitted as part of the CUP application for multi-family in WPC, I've been over the ordinance and believe that it is dear in that a complete application requires site plan that meets our minimum standards. As the Council may impose reasonable restrictions or conditions to carry out the spirit of the UDO and mitigate adverse effects, they may make better decisions with complete information before them. Please let me know if I can answer other questions. Thanks! Molly file://C:\Documents%20and%20Settings\tfletcher\Local%20Settings\Temp\XPGrpWise\43986BE... 12/8/2005 From: Kim Foutz To: Trey Fletcher Date: 8/1/2005 2:56:40 PM Subject: Re: Wolf Pen Creek- potential development Trey- I checked out their website and it looks like they only do multi-family housing (mainly student housing). I did not see any reference to mixed use which concerns me. Should we go ahead and have a meeting to discuss what the ordinance says about multi-family housing only(CUP) and what our position might be on it. As I mentioned earlier, this information should be available from Jane or Natalie's files. >>> Trey Fletcher 07/29/05 7:45 AM >>> Yes, in the event he requests a PAC, that would be helpful - I assume y'all have that. >>> Kim Foutz 07/28/05 6:42 PM >>> Thanks. sorry for responding so late, but I have been on vacation. Eons ago, I met with Jane and Natalie and we internally agreed on which tracts we would support for a conditional use permit for 100% multi- family. We might want to drag that information up in the event he pursues a PAC. >>> Trey Fletcher 07/22/05 8:24 AM >>> Inquiry calls come in daily, but because of our strategic interest in WPC I thought I would provide you with this heads heads up as to a potentially significant development in the WPC District. As Planner on Call yesterday I received a call from a Houston developer, Craig Dickerson (713-570-0350) regarding the 12 ac tract across from FS#1, next to the Arbors Apartments. The firm is the Dinerstein Companies http://www.dmcmqmt.com/home/and have developed here before on Holleman Drive West. As you multi-family in WPC requires a conditional use permit unless the residential uses are located in stories or floors above retail commercial uses. He did not seem put off by this and I encouraged him to hold a PAC, or similar meeting with us discuss this potential project. Trey Trey Fletcher, AICP Senior Planner Dept. of Planning & Development Services City of College Station 1101 Texas Avenue S. College Station, Texas 77840 979.764.3570/979.764.3496 Fax tfletcher(c�cstx.gov www.cstx.gov