HomeMy WebLinkAboutDrainage Report - VPAC IIADRAINAGE REPORT FOR CITY OF COLLEGE STATION PARKS & RECREATION DEPARTMENT VETERANS PARK AND ATHLETIC COMPLEX PHASE IIA OE JOB NO. 675.002-PA/PB COLLEGE STATION JOB NO. PK0501 July 2007 Prepared by: O’MALLEY ENGINEERS, L.L.P. P.O. Box 1976 Brenham, Texas 77834-1976 Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\TOC.doc TABLE OF CONTENTS CERTIFICATION SHEET EXECUTIVE SUMMARY GENERAL LOCATION AND DESCRIPTION OF PROJECT AREA ........................................1 DRAINAGE WATERSHED AND STUDY AREA.......................................................................1 DRAINAGE DESIGN CRITERIA................................................................................................. 2 DRAINAGE SYSTEM DESIGN................................................................................................... 2 CONCLUSIONS.............................................................................................................................3 REFERENCES ...............................................................................................................................4 APPENDICES APPENDIX A: FEMA MAP NOS. 48041C0161C & 48041C0142C WITH PROJECT SITE ILLUSTRATED APPENDIX B: DRAINAGE AREA MAPS APPENDIX C: WINSTORM REPORT – 10-YEAR FREQUENCY STORM APPENDIX D: NRCS DRAINAGE CALCULATIONS APPENDIX E: DRAINAGE SYSTEM DESIGN APPENDIX F: THYSYS CULVERT REPORT – 10-YEAR FREQUENCY STORM APPENDIX G: AUTODESK LAND DESKTOP CHANNEL CALCULATOR REPORT – 10-YEAR FREQUENCY STORM APPENDIX H: 100-YEAR FREQUENCY STORM REPORTS APPENDIX I: OVERALL SITE LAYOUT APPENDIX J: PENDING TXDOT PERMIT Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\certification.doc CERTIFICATION This report for the drainage design of the City of College Station Veterans Park and Athletic Complex was prepared under my supervision in accordance with provisions of the Bryan/College Station Unified Drainage Design Guidelines for the owners of the property. All licenses and permits required by any and all state and federal regulatory agencies for the proposed drainage improvements have been issued. Robert C. Schmidt, P.E. State of Texas No. 50465 Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Executive Summary.doc Page 1 of 2 EXECUTIVE SUMMARY The following drainage report was prepared by Robert C. Schmidt, P.E. of O’Malley Engineers, L.L.P. (OE) for the City of College Station Parks and Recreation Department (PARD) and submitted on July 9, 2007. The contact information for Mr. Schmidt and the PARD are as follows: Robert C. Schmidt, P.E. O’Malley Engineers, L.L.P. 203 South Jackson Street Brenham, Texas 77833 Phone: 979-836-7937 Fax: 979-836-7936 rcs@omalleyengineers.com Mr. Eric Ploeger Parks & Recreation Department City of College Station 1101 Texas Avenue College Station, Texas 77840-2499 Phase IIA of the Veterans Park and Athletic Complex (VPAC) involves approximately one third (1/3) of the 150.00 acre tract. Phases I and II each contained approximately one third (1/3) of the overall tract. Phase I has been completed and Phase II is currently under construction. The final phase of this development is Phase III, which has not been designed. Phase IIA involves extending Veterans Parkway to tie-into State Highway 60, storm sewer along the parkway, a culvert crossing, drainage channel to the Carters Creek floodplain and site grading. The VPAC site is located in the Carters Creek watershed between State Highway 30 and State Highway 60 in the City of College Station, Brazos County, Texas. The site is bounded to the south by the Carters Creek floodplain and to the north by Hudson Creek. Because the property is located within and adjacent to the Carters Creek floodplain, detention is not required by the City of College Station for this site. The site has very little topsoil, leading to a lack of vegetation. Stormwater run-off enters the project site at the northwest corner of the property and flows overland in the form of sheet flow to the south where it enters the Carters Creek floodplain and leaves the property. The stormwater will continue to flow overland and either flow directly through proposed dual six feet (6 ft.) by three feet (3 ft.) box culverts that cross Veterans Parkway or will enter one of several inlets along the street. All water entering the inlets will flow through the underground storm drainage system and outfall to a proposed drainage channel at the end of the culvert. The proposed channel will carry the stormwater south approximately 833 feet where it will then fan out into the floodplain. Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Executive Summary.doc Page 2 of 2 OE has worked with the City and the Texas Department of Transportation (TxDOT) to complete Phase IIA of this project. TxDOT was involved in the design of the Veterans Parkway intersection with State Highway 60. The PARD has applied for a permit from TxDOT for the tie-in. The drainage report for this project includes one four page drainage report with appendices dated July 3, 2007, one 19 sheet set of construction drawings dated July 3, 2007 and one specification and contract document book dated July 3, 2007. Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Drainage Report - Phase IIA.doc Page 1 of 4 GENERAL LOCATION AND DESCRIPTION OF PROJECT AREA The Veterans Park and Athletic Complex (VPAC) is located between State Highway 30 and State Highway 60 on the northeast side of College Station. The park is located inside the City of College Station, Brazos County, Texas and is owned by the City of College Station. The 150.00 acre tract is bounded on the south by the Carters Creek floodplain and on the northeast by Hudson Creek. The land directly to the north is primarily undeveloped except for the existing Texas A&M University facility to the northwest. The properties directly across State Highway 30 and State Highway 60 and bordering the VPAC property are all currently undeveloped. Phase I of the VPAC was completed in September 2002 and Phase II is currently under construction. The VPAC is proposed to contain three phases, each encompassing approximately one-third (1/3) of the overall project area. The current phase, Phase IIA, is to extend Veterans Parkway to tie-into State Highway 60. The project also involves a storm sewer system along Veterans Parkway, a culvert crossing the street and a drainage channel from the culvert to the Carters Creek floodplain. The entire project site drains into the Carters Creek watershed. An overall site layout is included in Appendix I. The undeveloped portion of this tract has very little topsoil or vegetation. DRAINAGE WATERSHED AND STUDY AREA Phase IIA of the VPAC drains directly into the Carters Creek floodplain. The floodplain for Carters Creek is shown on the City of College Station FEMA Floodplain Panel Nos. 48041C161C and 48041C0142C (Appendix A). The existing land uses for the drainage areas affecting this project are pasture/ranch lands, undeveloped commercial and commercial uses. Drawings showing the drainage areas used in this study may be referenced in Appendix B. The run-off from the area directly north of the park, Drainage Area K-2, flows over land to a natural channel that flows south and enters the VPAC at the northwest corner. The channel then fans out and the run-off flows over land across the park property and to the Carters Creek floodplain. The run-off from the area on the northwest side of State Highway 60, Drainage Area K-1, crosses the highway through a culvert and flows over land to the channel located in Drainage Area K-2. The proposed drainage plan will allow the water to flow over land from drainage areas K-1 and K-2 to a culvert that crosses under Veterans Parkway. The culvert will empty into a trapezoidal drainage channel which runs to the south toward the Carters Creek floodplain. The flow from drainage areas J-10 through J-70 will enter into the storm sewer system along Veterans Parkway and discharge at the end of the culvert into the proposed drainage channel. From the channel, the water will flow over land through the floodplain into Carters Creek. The proposed drainage system is planned to follow the existing flow patterns as closely as possible. This drainage plan is not to impact any off-site drainage. Detention is not required for this site as it drains directly into a regulatory watercourse floodplain and there are no existing land features on-site for storing and/or detaining stormwater. Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Drainage Report - Phase IIA.doc Page 2 of 4 DRAINAGE DESIGN CRITERIA The entire drainage system for the VPAC Phase IIA is designed for a 10-year storm frequency and was tested for a 100-year storm frequency. Two prior drainage plans have been prepared and approved by the City for the VPAC site, one for Phase I and one for Phase II. This plan assumes that all Above-Project Areas will be designed so as not to change the flows entering the VPAC. The site will be graded so that all stormwater run-off flows away from any existing or proposed structures and spreads out over a large area. The design flows for the project site were calculated using two methods. The flows for areas J- 10 through J-70 were calculated using the Rational Method and WinStorm. The areas, C values, time of concentration and rainfall intensities were entered into WinStorm to calculate the flows. The design flows for the culvert were calculated using the Natural Resources Conservation Service (NRCS) Graphical Peak Discharge Method and checked using the NRCS Tabular Hydrograph Method. The WinStorm report may be found in Appendix C and the NRCS Calculations may be found in Appendix D The stormwater currently travels as sheet flow over land and not in a defined channel, making it difficult to calculate the existing flow capacity of the site. The storm sewer system is designed for a flow of 16.18 cfs, the culvert for 263 cfs and the drainage channel is designed for 280 cfs. The only deviation from the Unified Stormwater Design Guidelines is the slope of the proposed channel. The existing natural slope of the project site will not allow for a minimum slope of 0.6%. DRAINAGE SYSTEM DESIGN Using WinStorm to calculate the flows and design the storm sewer system, the 10-year storm produces a total out flow of 16.18 cfs. This flow requires a 30-inch outfall pipe into the drainage channel. A minimum slope of 0.24% will be utilized in the storm sewer system to maintain the minimum allowable design velocity of 2.5 feet per second (f/s). The maximum velocity achieved in the WinStorm computations is 4.08 f/s, which is far below the maximum permissible of 15 f/s. The storm drain conduits were designed for a maximum capacity of 25.95 cfs. The complete report produced by WinStorm is included in Appendix C, the drainage system design is located in Appendix E and an electronic version of the analysis is also included with this report. The NRCS method was utilized to calculate the design flows for the proposed culvert on Veterans Parkway. The 10-year storm flow was calculated to be 263 cfs entering the culvert. Using Thysys Culvert, the maximum allowable headwater was set one foot (1 ft.) below the lowest top of curb at the crossing. The maximum tailwater was set at the soffit of the storm sewer outfall. Through the use of Thysys it was determined that dual six foot (6 ft.) by three foot (3 ft.) concrete box culverts would be appropriate to accommodate the 10-year storm. A discharge velocity of 7.43 f/s was calculated by Thysys. The channel directly following the culvert will be concrete lined, allowing for a maximum discharge velocity of 15 f/s. The Thysys report may be referenced in Appendix F. Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Drainage Report - Phase IIA.doc Page 3 of 4 The design flows for the storm sewer system and the culvert were added together to design the drainage channel that they both flow into. A design flow of 280 cfs was used. The Channel Calculator in Autodesk Land Desktop was used to calculate the required channel cross section. The channel was designed with a trapezoidal cross section with 4:1 side slopes and an average channel slope of 0.24%. Due to the existing topography of the project site, a minimum slope of 0.6% is not achievable. A Manning’s Roughness Coefficient of 0.025 was assumed. The maximum water depth of three feet (3 ft.) was assumed as this is the maximum tailwater of the culvert. The depth of flow was calculated as 2.93 feet, which is below the maximum three feet (3 ft.) and allows for a minimum freeboard of one foot (1 ft.). A bottom width of 10 feet was calculated to be sufficient for the design flow. The calculated velocity of 4.41 f/s is just below the maximum velocity of 4.5 f/s for a grass surface treatment that is seeded with an erosion mat. The Channel Calculator report is attached as Appendix G. All three systems were also tested for a 100-year storm frequency. The 100-year storm flow for drainage areas J-10 through J-70 is 22 cfs and the storm sewer is designed for a flow capacity of 25.95 cfs; therefore, the storm sewer system can handle the 100-year storm flow created in these areas. The result for the culvert was a headwater elevation approximately one foot (1’) over the roadway at the lowest point and a depth of 3.7 feet in the drainage channel. In the event of a 100- year frequency storm no structures will be damaged as the site grading is designed for the stormwater to sheet flow over the low point in the road, flowing away from any structures. The 100-year storm reports are in Appendix H. CONCLUSIONS The Bryan/College Station Unified Stormwater Design Guidelines were used as a reference throughout the entire design of this stormwater drainage system. This system was designed to minimize flooding of the VPAC site and maximum velocities were strictly adhered to so as to reduce the occurrence of erosion. The stormwater drainage system was designed to effectively accommodate all flows produced by the fully developed site. Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Drainage Report - Phase IIA.doc Page 4 of 4 REFERENCES Hydraulic Design Manual. Texas Department of Transportation. March 2004. Unified Stormwater Design Guidelines. City of Bryan and City of College Station. February 2007. Urban Hydrology for Small Watersheds – TR-55. United States Department of Agriculture – Natural Resources Conservation Service. June 1986. APPENDIX A FEMA MAP NOS. 48041C0161C & 48041C0142C WITH PROJECT SITE ILLUSTRATED APPENDIX B DRAINAGE AREA MAPS APPENDIX C WINSTORM REPORT 10-YEAR FREQUENCY STORM Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Appendix C.doc Page 1 of 2 APPENDIX C WINSTORM REPORT 10-YEAR FREQUENCY STORM WinStorm (STORM DRAIN DESIGN) Version 3.05, Jan. 25, 2002 Run @ 6/20/2007 10:42:14 AM PROJECT NAME : VPAC PH IIA JOB NUMBER : 675.02PA PROJECT DESCRIPTION : Storm Sewer Line J 10 YR Design ANALYSYS FREQUENCY : 10 Years MEASUREMENT UNITS: ENGLISH ================================================================================== OUTPUT FOR ANALYSYS FREQUENCY of: 10 Years ============================================= Runoff Computation for Design Frequency. ============================================================================= ID C Value Area Tc Tc Used Intensity Supply Q Total Q (acre) (min) (min) (in/hr) (cfs) (cfs) ----------------------------------------------------------------------------- J-10 0.45 0.52 10.00 10.00 8.63 0.000 2.020 J-20 0.48 0.46 10.00 10.00 8.63 0.000 1.907 J-30 0.32 2.41 10.00 10.00 8.63 0.000 6.659 J-40 0.47 0.36 10.00 10.00 8.63 0.000 1.461 J-50 0.64 0.16 10.00 10.00 8.63 0.000 0.884 J-60 0.59 0.53 10.00 10.00 8.63 0.000 2.700 J-70 0.62 0.41 10.00 10.00 8.63 0.000 2.195 ----------------------------------------------------------------------------- Sag Inlets Configuration Data. ================================================================================== Inlet Inlet Length/ Grate Left-Slope Right-Slope Gutter Depth Critic ID Type Perim. Area Long Trans Long Trans n DeprW Allowed Elev. (ft) (sf) (%) (%) (%) (%) (ft) (ft) (ft) ---------------------------------------------------------------------------------- J-10 Curb 5.00 n/a 0.60 2.00 0.60 2.00 0.014 1.50 0.50 263.20 J-20 Curb 5.00 n/a 0.60 2.00 0.60 2.00 0.014 1.50 0.50 263.20 J-30 Grate 12.00 3.30 10.00 2.00 10.00 2.00 0.014 n/a 1.00 263.00 J-40 Curb 5.00 n/a 1.00 2.00 1.00 2.00 0.014 1.50 0.50 263.50 J-50 Curb 5.00 n/a 1.00 2.00 1.00 2.00 0.014 1.50 0.50 263.50 J-60 Curb 5.00 n/a 0.60 2.00 0.60 2.00 0.014 1.50 0.50 262.00 J-70 Curb 5.00 n/a 0.60 2.00 0.60 2.00 0.014 1.50 0.50 262.30 ---------------------------------------------------------------------------------- Sag Inlets Computation Data. ================================================================================ Inlet Inlet Length Grate Total Q Inlet Total Ponded Width ID Type Perim Area Capacity Head Left Right (ft) (ft) (sf) (cfs) (cfs) (ft) (ft) (ft) -------------------------------------------------------------------------------- J-10 Curb 5.00 n/a n/a 2.020 6.261 0.235 7.55 7.55 J-20 Curb 5.00 n/a n/a 1.907 6.261 0.226 7.40 7.40 J-30 Grate n/a 12.00 3.30 6.659 17.736 0.319 7.00 7.00 J-40 Curb 5.00 n/a n/a 1.461 6.261 0.190 6.10 6.10 J-50 Curb 5.00 n/a n/a 0.884 6.261 0.136 5.05 5.05 J-60 Curb 5.00 n/a n/a 2.700 6.261 0.285 8.45 8.45 J-70 Curb 5.00 n/a n/a 2.195 6.261 0.249 7.80 7.80 -------------------------------------------------------------------------------- Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Appendix C.doc Page 2 of 2 Cumulative Junction Discharge Computations ================================================================================= Node Node Weighted Cumulat. Cumulat. Intens. User Additional Total I.D. Type C-Value Dr.Area Tc Supply Q Q in Node Disch. (acres) (min) (in/hr) cfs) (cfs) (cfs) --------------------------------------------------------------------------------- J-10 Curb 0.450 0.52 10.00 8.63 0.000 0.00 2.020 J-20 Curb 0.464 0.98 10.14 8.58 0.000 0.00 3.904 J-30 Grate 0.320 2.41 10.00 8.63 0.000 0.00 6.659 J-40 Curb 0.372 3.75 11.48 8.14 0.000 0.00 11.360 J-50 Curb 0.383 3.91 11.57 8.11 0.000 0.00 12.151 J-60 Curb 0.408 4.44 12.33 7.89 0.000 0.00 14.278 J-70 Curb 0.426 4.85 12.51 7.84 0.000 0.00 16.178 j-31 JnctBx 0.362 3.39 10.76 8.37 0.000 0.00 10.264 OUT Outlt 0.426 4.85 12.51 7.84 0.000 0.00 16.178 --------------------------------------------------------------------------------- Conveyance Configuration Data ================================================================================== Run# Node I.D. Flowline Elev. US DS US DS Shape # Span Rise Length Slope n_value (ft) (ft) (ft) (ft) (ft) (%) ---------------------------------------------------------------------------------- 10 J-10 J-20 260.73 260.65 Circ 1 0.00 1.25 26.00 0.31 0.013 20 J-20 j-31 260.10 259.82 Circ 1 0.00 2.00 118.00 0.24 0.013 30 J-30 j-31 259.90 259.82 Circ 1 0.00 2.00 26.00 0.31 0.013 31 j-31 J-40 259.32 258.90 Circ 1 0.00 2.50 176.00 0.24 0.013 40 J-40 J-50 258.85 258.77 Circ 1 0.00 2.50 26.00 0.31 0.013 50 J-50 J-60 258.72 257.98 Circ 1 0.00 2.50 221.00 0.33 0.013 60 J-60 J-70 257.93 257.73 Circ 1 0.00 2.50 55.00 0.36 0.013 70 J-70 OUT 257.68 257.60 Circ 1 0.00 2.50 20.00 0.40 0.013 ---------------------------------------------------------------------------------- Conveyance Hydraulic Computations. Tailwater = 260.100 (ft) ================================================================================== Hydraulic Gradeline Depth Velocity Junc Run# US Elev DS Elev Fr.Slope Unif. Actual Unif. Actual Q Cap Loss (ft) (ft) (%) (ft) (ft) (f/s) (f/s) (cfs) (cfs) (ft) ---------------------------------------------------------------------------------- 10 261.58 261.22 0.098 0.67 0.67 3.00 3.00 2.02 3.58 0.174 20 261.01 260.82 0.030 0.83 1.00 3.18 2.47 3.90 11.02 0.047 30 261.06 260.82 0.087 1.03 1.03 4.08 4.08 6.66 12.55 0.129 31 260.82 260.60 0.063 1.27 1.70 4.10 2.88 10.26 20.04 0.065 40 260.60 260.51 0.077 1.25 1.74 4.63 3.11 11.36 22.76 0.075 50 260.51 260.33 0.088 1.27 2.35 4.85 2.54 12.15 23.74 0.050 60 260.33 260.21 0.121 1.37 2.48 5.20 2.91 14.28 24.74 0.066 70 260.21 260.10 0.156 1.43 2.50 5.59 3.30 16.18 25.95 0.084 ===================================END============================================ NORMAL TERMINATION OF WINSTORM. Warning Messages for current project: Runoff Frequency of: 10 Years APPENDIX D NRCS DRAINAGE CALCULATIONS Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Appendix D.doc Page 1 of 5 APPENDIX D NRCS DRAINAGE CALCULATIONS NRCS GRAPHICAL PEAK DISCHARGE METHOD TOTAL DRAINAGE AREA, A: A = 138.4 AC. 0.2163 SQ. MI. TYPE III RAINFALL DISTRIBUTION RUNOFF CURVE NUMBER, RCN: BUSINESS/COMMERCIAL RCN = 94 A = 14.8 AC. NATURAL GRASSLANDS/WOODLANDS RCN = 75 A = 106.1 AC. IMPERVIOUS AREAS RCN = 98 A = 17.5 AC. WEIGHTED AVERAGE RCN1*A1 + RCN2*A2 + …. RCN = A RCN = 80 TIME OF CONCENTRATION, Tc: ASSUME v = 0.75 FT/S FOR GRASS/WOODLAND ASSUME v = 1 FT/S FOR NATURAL CHANNEL FROM TABLE C-4 OF UNIFIED DIST. TRAVELED Tc = v * 60 * 60 HOURS Tc = 1.44 HR. Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Appendix D.doc Page 2 of 5 POTENTIAL MAX. RETENTION, S: S = z*[(100/RCN)-1] S = 2.5 IN. INITIAL ABSTRACTION, Ia: Ia = 0.2 * S IN. Ia = 0.50 IN. ACCUMULATED RAINFALL, P: FROM TABLE C-6 OF UNIFIED 24-HR. STORM DURATION P2 = 4.50 IN. P5 = 6.20 IN. P10 = 7.40 IN. P25 = 8.40 IN. P50 = 9.80 IN. P100 = 11.00 IN. ACCUMULATED DIRECT RUNOFF, R: R = (P-0.2*S)^2 (P+0.8*S) R2 = 2.46 IN. R5 = 3.96 IN. R10 = 5.06 IN. R25 = 5.99 IN. R50 = 7.32 IN. R100 = 8.47 IN. UNIT PEAK DISCHARGE, qu: Ia/P2 = 0.11 Ia/P5 = 0.08 Ia/P10 = 0.07 Ia/P25 = 0.06 Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Appendix D.doc Page 3 of 5 Ia/P50 = 0.05 Ia/P100 =0.05 ONLY THE 2-YEAR STORM FALLS WITHIN BOUNDS OF TABLE PER TR-55 USE LIMITING VALUE USE 0.1 LIMIT FOR ALL USE EXHIBIT 4-III OF TR-55 FOR qu VALUE qu = 240 CSM/IN PONDING FACTOR, F: 0% PONDING F = 1 PEAK DISCHARGE, Q: Q = quARF Q2 = 127 CFS Q5 = 205 CFS Q10 = 263 CFS Q25 = 311 CFS Q50 = 380 CFS Q100 = 440 CFS Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Appendix D.doc Page 4 of 5 NRCS TABULAR HYDROGRAPH METHOD A = 0.2163 SQ. MI. Tc = 1.44 HR. RCN = 80 TYPE III P10 = 7.4 IN. R10 = 5.06 IN. TIME (HRS.) qt (CSM/IN.) Q (CFS) 11 3 3.28 12 8 8.76 13 19 20.80 14 103.0 112.73 15 207.0 226.56 16 99.0 108.35 17 54.0 59.10 18 36.0 39.40 19 26.0 28.46 20 20.0 21.89 22 14.0 15.32 26 8.0 8.76 USING TR-55 10-YEAR UNIT HYDROGRAPH 0 50 100 150 200 250 11 12 13 14 15 16 17 18 19 20 22 26 HYDROGRAPH TIME (HR.) UN I T D I S C H A R G E ( C S M / I N ) Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Appendix D.doc Page 5 of 5 HYDROGRAPH 0.00 50.00 100.00 150.00 200.00 250.00 11 12 13 14 15 16 17 18 19 20 22 26 HYDROGRAPH TIME (HR.) DI S C H A R G E ( C F S ) APPENDIX E DRAINAGE SYSTEM DESIGN APPENDIX F THYSYS CULVERT REPORT 10-YEAR FREQUENCY STORM Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Appendix F.doc Page 1 of 1 APPENDIX F THYSYS CULVERT REPORT 10-YEAR FREQUENCY STORM TEXAS HYDRAULIC SYSTEM, CULVERT (ver. 1.2. Feb/2002) Mon Jul 02 11:22:59 2007 CULVERT HYDRAULIC COMPUTATIONS ------------------------------ CULVERT NAME: VPAC Input Units: English PROJECT NAME: VPAC Output Units: English PROJECT CONTROL: OE Job No. 675.02 PA COUNTY: Brazos DESCRIPTION: VPAC Culvert ANALYZE MULTIPLE OPENING CULVERT MATERIAL: CONCRETE SHAPE: CONCRETE BOX. ENTRANCE: STRAIGHT PROFILE: STRAIGHT CULVERT FREQUENCY: 10-Year DISCHARGE: 263.00 cfs TAILWATER: 260.10 ft n value: 0.0120 Ke value: 0.7000 CULVERT RISE = 3.00 ft CULVERT SPAN = 6.00 ft BARRELS = 2 INLET station: 0.00 elevation: 257.70 ft OUTLET station: 106.00 elevation: 257.10 ft Road profile (XY Coordinates) ft X Y X Y X Y 19.00 263.40 87.00 263.60 ------------------------------------------------------------------------------ ------------------------------------------------------------------------------ CULVERT OUTPUT RUN NO => 1 ------------------------------------------------------------------------------ ANALYSIS for discharge frequency of : 10-Year Barls. Qpb Rise Span Length Max.HW Calc.HW HW Control Veloc. Out.depth elev elev cfs ft ft ft ft ft ft ft/s ft ------------------------------------------------------------------------------ 2 131.50 3.00 6.00 88.00 262.30 262.35 4.70 Inlet 7.43 2.95 Inlet control depth = 4.70 ft Outlet control depth = 4.85 ft Normal depth = 2.06 ft Culvert slope = 0.00566 Critical depth = 2.46 ft Critical slope = 0.00345 Road top width => 68.00 ft. Road pavement type => asphalt Computed Weir Coefficient => 3.00. No discharge over the road. ------------------------------------------------------------------------------ RUNING MESSAGES LIST: *Computation: Outlet velocity is based on the tail water depth. NORMAL TERMINATION OF THYSYS, CULVERT. APPENDIX G AUTODESK LAND DESKTOP CHANNEL CALCULATOR REPORT 10-YEAR FREQUENCY STORM Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Appendix G.doc Page 1 of 1 APPENDIX G AUTODESK LAND DESKTOP CHANNEL CALCULATOR REPORT 10-YEAR FREQUENCY STORM Channel Calculator Given Input Data: Shape ........................... Trapezoidal Solving for ..................... Depth of Flow Flowrate ........................ 280.0000 cfs Slope ........................... 0.0024 ft/ft Manning's n ..................... 0.0250 Height .......................... 5.0000 ft Bottom width .................... 10.0000 ft Left slope ...................... 0.2500 ft/ft (V/H) Right slope ..................... 0.2500 ft/ft (V/H) Computed Results: Depth ........................... 2.9272 ft Velocity ........................ 4.4063 fps Full Flowrate ................... 893.9522 cfs Flow area ....................... 63.5447 ft2 Flow perimeter .................. 34.1380 ft Hydraulic radius ................ 1.8614 ft Top width ....................... 33.4173 ft Area ............................ 150.0000 ft2 Perimeter ....................... 51.2311 ft Percent full .................... 58.5432 % Critical Information: Critical depth .................. 2.1706 ft Critical slope .................. 0.0082 ft/ft Critical velocity ............... 6.9049 fps Critical area ................... 40.5508 ft2 Critical perimeter .............. 27.8989 ft Critical hydraulic radius ....... 1.4535 ft Critical top width .............. 27.3644 ft Specific energy ................. 3.2289 ft Minimum energy .................. 3.2558 ft Froude number ................... 0.5633 Flow condition .................. Subcritical APPENDIX H 100-YEAR FREQUENCY STORM REPORTS Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Appendix H.doc Page 1 of 4 APPENDIX H 100-YEAR FREQUENCY STORM REPORTS WINSTORM WinStorm (STORM DRAIN DESIGN) Version 3.05, Jan. 25, 2002 Run @ 6/20/2007 10:55:45 AM PROJECT NAME : VPAC PH IIA JOB NUMBER : 675.02PA PROJECT DESCRIPTION : Storm Sewer Line J 100 YR Check ANALYSYS FREQUENCY : 100 Years MEASUREMENT UNITS: ENGLISH ================================================================================== OUTPUT FOR ANALYSYS FREQUENCY of: 100 Years ============================================= Runoff Computation for Design Frequency. ============================================================================= ID C Value Area Tc Tc Used Intensity Supply Q Total Q (acre) (min) (min) (in/hr) (cfs) (cfs) ----------------------------------------------------------------------------- J-10 0.45 0.52 10.00 10.00 11.64 0.000 2.724 J-20 0.48 0.46 10.00 10.00 11.64 0.000 2.570 J-30 0.32 2.41 10.00 10.00 11.64 0.000 8.976 J-40 0.47 0.36 10.00 10.00 11.64 0.000 1.969 J-50 0.64 0.16 10.00 10.00 11.64 0.000 1.192 J-60 0.59 0.53 10.00 10.00 11.64 0.000 3.640 J-70 0.62 0.41 10.00 10.00 11.64 0.000 2.959 ----------------------------------------------------------------------------- Sag Inlets Configuration Data. ================================================================================== Inlet Inlet Length/ Grate Left-Slope Right-Slope Gutter Depth Critic ID Type Perim. Area Long Trans Long Trans n DeprW Allowed Elev. (ft) (sf) (%) (%) (%) (%) (ft) (ft) (ft) ---------------------------------------------------------------------------------- J-10 Curb 5.00 n/a 0.60 2.00 0.60 2.00 0.014 1.50 0.50 263.20 J-20 Curb 5.00 n/a 0.60 2.00 0.60 2.00 0.014 1.50 0.50 263.20 J-30 Grate 12.00 3.30 10.00 2.00 10.00 2.00 0.014 n/a 1.00 263.00 J-40 Curb 5.00 n/a 1.00 2.00 1.00 2.00 0.014 1.50 0.50 263.50 J-50 Curb 5.00 n/a 1.00 2.00 1.00 2.00 0.014 1.50 0.50 263.50 J-60 Curb 5.00 n/a 0.60 2.00 0.60 2.00 0.014 1.50 0.50 262.00 J-70 Curb 5.00 n/a 0.60 2.00 0.60 2.00 0.014 1.50 0.50 262.30 ---------------------------------------------------------------------------------- Sag Inlets Computation Data. ================================================================================ Inlet Inlet Length Grate Total Q Inlet Total Ponded Width ID Type Perim Area Capacity Head Left Right (ft) (ft) (sf) (cfs) (cfs) (ft) (ft) (ft) -------------------------------------------------------------------------------- J-10 Curb 5.00 n/a n/a 2.724 6.261 0.287 8.45 8.45 J-20 Curb 5.00 n/a n/a 2.570 6.261 0.276 8.30 8.30 J-30 Grate n/a 12.00 3.30 8.976 17.736 0.389 7.80 7.80 J-40 Curb 5.00 n/a n/a 1.969 6.261 0.231 6.80 6.80 J-50 Curb 5.00 n/a n/a 1.192 6.261 0.165 5.65 5.65 J-60 Curb 5.00 n/a n/a 3.640 6.261 0.348 9.45 9.45 J-70 Curb 5.00 n/a n/a 2.959 6.261 0.303 8.75 8.75 -------------------------------------------------------------------------------- Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Appendix H.doc Page 2 of 4 Cumulative Junction Discharge Computations ================================================================================= Node Node Weighted Cumulat. Cumulat. Intens. User Additional Total I.D. Type C-Value Dr.Area Tc Supply Q Q in Node Disch. (acres) (min) (in/hr) cfs) (cfs) (cfs) --------------------------------------------------------------------------------- J-10 Curb 0.450 0.52 10.00 11.64 0.000 0.00 2.724 J-20 Curb 0.464 0.98 10.14 11.58 0.000 0.00 5.265 J-30 Grate 0.320 2.41 10.00 11.64 0.000 0.00 8.976 J-40 Curb 0.372 3.75 11.36 11.04 0.000 0.00 15.397 J-50 Curb 0.383 3.91 11.45 11.00 0.000 0.00 16.473 J-60 Curb 0.408 4.44 12.15 10.72 0.000 0.00 19.404 J-70 Curb 0.426 4.85 12.32 10.66 0.000 0.00 21.997 j-31 JnctBx 0.362 3.39 10.70 11.32 0.000 0.00 13.878 OUT Outlt 0.426 4.85 12.32 10.66 0.000 0.00 21.997 --------------------------------------------------------------------------------- Conveyance Configuration Data ================================================================================== Run# Node I.D. Flowline Elev. US DS US DS Shape # Span Rise Length Slope n_value (ft) (ft) (ft) (ft) (ft) (%) ---------------------------------------------------------------------------------- 10 J-10 J-20 260.73 260.65 Circ 1 0.00 1.25 26.00 0.31 0.013 20 J-20 j-31 260.10 259.82 Circ 1 0.00 2.00 118.00 0.24 0.013 30 J-30 j-31 259.90 259.82 Circ 1 0.00 2.00 26.00 0.31 0.013 31 j-31 J-40 259.32 258.90 Circ 1 0.00 2.50 176.00 0.24 0.013 40 J-40 J-50 258.85 258.77 Circ 1 0.00 2.50 26.00 0.31 0.013 50 J-50 J-60 258.72 257.98 Circ 1 0.00 2.50 221.00 0.33 0.013 60 J-60 J-70 257.93 257.73 Circ 1 0.00 2.50 55.00 0.36 0.013 70 J-70 OUT 257.68 257.60 Circ 1 0.00 2.50 20.00 0.40 0.013 ---------------------------------------------------------------------------------- Conveyance Hydraulic Computations. Tailwater = 260.100 (ft) ================================================================================== Hydraulic Gradeline Depth Velocity Junc Run# US Elev DS Elev Fr.Slope Unif. Actual Unif. Actual Q Cap Loss (ft) (ft) (%) (ft) (ft) (f/s) (f/s) (cfs) (cfs) (ft) ---------------------------------------------------------------------------------- 10 261.75 261.39 0.178 0.82 0.82 3.19 3.19 2.72 3.58 0.198 20 261.39 261.29 0.054 0.97 1.47 3.49 2.13 5.26 11.02 0.035 30 261.43 261.29 0.157 1.25 1.47 4.35 3.63 8.98 12.55 0.102 31 261.29 261.04 0.114 1.52 2.14 4.43 3.10 13.88 20.04 0.075 40 261.04 260.93 0.141 1.52 2.16 4.92 3.42 15.40 22.76 0.091 50 260.93 260.55 0.161 1.52 2.50 5.26 3.36 16.47 23.74 0.088 60 260.55 260.31 0.224 1.68 2.50 5.53 3.95 19.40 24.74 0.121 70 260.31 260.10 0.288 1.76 2.50 5.96 4.48 22.00 25.95 0.156 ===================================END============================================ NORMAL TERMINATION OF WINSTORM. Warning Messages for current project: Runoff Frequency of: 100 Years Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Appendix H.doc Page 3 of 4 THYSYS CULVERT TEXAS HYDRAULIC SYSTEM, CULVERT (ver. 1.2. Feb/2002) Mon Jul 02 11:31:53 2007 CULVERT HYDRAULIC COMPUTATIONS ------------------------------ CULVERT NAME: 100-year Input Units: English PROJECT NAME: VPAC - 100 yr. Output Units: English PROJECT CONTROL: OE 675.02 PA COUNTY: Brazos DESCRIPTION: 100-year Flow Analysis ANALYZE MULTIPLE OPENING CULVERT MATERIAL: CONCRETE SHAPE: CONCRETE BOX. ENTRANCE: STRAIGHT PROFILE: STRAIGHT CULVERT FREQUENCY: 100-year DISCHARGE: 440.00 cfs TAILWATER: 260.80 ft n value: 0.0120 Ke value: 0.7000 CULVERT RISE = 3.00 ft CULVERT SPAN = 6.00 ft BARRELS = 2 INLET station: 0.00 elevation: 257.70 ft OUTLET station: 106.00 elevation: 257.10 ft Road profile (XY Coordinates) ft X Y X Y X Y 19.00 263.40 87.00 263.60 ------------------------------------------------------------------------------ ------------------------------------------------------------------------------ CULVERT OUTPUT RUN NO => 1 ------------------------------------------------------------------------------ ANALYSIS for discharge frequency of : 100-year Barls. Qpb Rise Span Length Max.HW Calc.HW HW Control Veloc. Out.depth elev elev cfs ft ft ft ft ft ft ft/s ft ------------------------------------------------------------------------------ 2 171.02 3.00 6.00 88.00 262.30 264.10 6.45 Inlet 9.50 3.00 Inlet control depth = 6.45 ft Outlet control depth = 6.05 ft Normal depth = 2.49 ft Culvert slope = 0.00566 Critical depth = 2.93 ft Critical slope = 0.00364 Road top width => 68.00 ft. Road pavement type => asphalt Computed Weir Coefficient => 3.03. Toal Discharge => 440.00 cfs Discharge per barrel => 171.02 cfs Discharge over the road => 97.97 cfs Average velocity over the road => 2.35 ft/sec ------------------------------------------------------------------------------ RUNING MESSAGES LIST: NORMAL TERMINATION OF THYSYS, CULVERT. Veterans Park and Athletic Complex – Phase IIA Drainage Report K:\00675\675-02PA\Report\Appendix H.doc Page 4 of 4 AUTODESK LAND DESKTOP - CHANNEL CALCULATOR Channel Calculator Given Input Data: Shape ........................... Trapezoidal Solving for ..................... Depth of Flow Flowrate ........................ 462.0000 cfs Slope ........................... 0.0024 ft/ft Manning's n ..................... 0.0250 Height .......................... 5.0000 ft Bottom width .................... 10.0000 ft Left slope ...................... 0.2500 ft/ft (V/H) Right slope ..................... 0.2500 ft/ft (V/H) Computed Results: Depth ........................... 3.7043 ft Velocity ........................ 5.0256 fps Full Flowrate ................... 893.9522 cfs Flow area ....................... 91.9295 ft2 Flow perimeter .................. 40.5463 ft Hydraulic radius ................ 2.2673 ft Top width ....................... 39.6342 ft Area ............................ 150.0000 ft2 Perimeter ....................... 51.2311 ft Percent full .................... 74.0856 % Critical Information: Critical depth .................. 2.8197 ft Critical slope .................. 0.0076 ft/ft Critical velocity ............... 7.7002 fps Critical area ................... 59.9988 ft2 Critical perimeter .............. 33.2516 ft Critical hydraulic radius ....... 1.8044 ft Critical top width .............. 32.5573 ft Specific energy ................. 4.0968 ft Minimum energy .................. 4.2295 ft Froude number ................... 0.5818 Flow condition .................. Subcritical APPENDIX I OVERALL SITE LAYOUT APPENDIX J PENDING TxDOT PERMIT Permit to Construct Access Driveway Facilities on Highway Right of Way To: City of College Station Hwy. FM 60 Permit No. (Name) 1101 Texas Ave. Control Section (Address) College Station, Texas 77840-2499 (979) 764-3500 (City, State, Zip) (Phone No.) The Texas Department of Transportation, hereinafter called the State, hereby authorizes City of College Station , hereinafter called the Permittee, to construct / reconstruct a Park Entrance Road (residential, convenience store, retail mall, farm, etc.) access driveway on the highway right of way abutting highway number FM 60 in Brazos County, located CSJ: 0506-01-082, Sta. +/- 26+20 . Subject to the following: 1. The Permittee is responsible for all costs associated with the construction of this access driveway. 2. Design of facilities shall be as follows and/or as shown on sketch and is subject to conditions stated below: Construct a Park Entrance Road (see attached sketch for more details). All construction and materials shall be subject to inspection and approved by the State. 3. Maintenance of facilities constructed hereunder shall be the responsibility of the Permittee, and the State reserves the right to require any changes, maintenance or repairs as may be necessary to provide protection of life or property on or adjacent to the highway. Changes in design will be made only with approval of the State. 4. The Permittee shall hold harmless the State and its duly appointed agents and employees against any action for personal injury or property damage sustained by reason of the exercise of this permit. 5. Except for regulatory and guide signs at county roads and city streets, the Permittee shall not erect any sign on or extending over any portion of the highway right of way, and vehicle service fixtures such as fuel pumps, vendor stands, or tanks shall be located at least 12 feet from the right of way line to ensure that any vehicle services from these fixtures will be off the highway right of way. 6. The State reserves the right to require a new access driveway permit in the event of a land use change or change in driveway traffic volume or vehicle types. 7. This permit will become null and void if the above-referenced driveway facilities are not constructed within six (6) months from the issuance date of this permit. 8. The Permittee will contact the State’s representative Walter Norwood, Brazos County Maintenance Supervisor telephone, (979 ) 778-8054 , at least twenty-four (24) hours prior to beginning the work authorized by this permit. Texas Department of Transportation Date of Issuance Authorized Representative The undersigned hereby agrees to comply with the terms and conditions set forth in this permit for construction of an access driveway on the highway right of way. Date: Signed: (Property owner or owner’s representative) Form 1058 (Rev. 9/2004) (GSD-EPC) Page 1 of 2 Form 1058 (Rev. 9/2004) Page 2 of 2 Access Driveway Regulations The Texas Transportation Commission, in recognition of its responsibility for the safety and utility of public highways under its jurisdiction, has directed the department to adopt access driveway standards to accomplish a coordinated development between highways and abutting property. For this purpose, the booklet entitled “Regulations for Access Driveways to State Highways”, was published and adopted, setting out departmental policies to regulate construction and maintenance of access driveway facilities. _____________________________________________________________________________________________ Sketch of Installation