Loading...
HomeMy WebLinkAbout07-183 Documentstnir IO/D /U PIE P.O.Box 9253,College Station,TX 77842 Off/Fax:(979)690-0329 C.onsu/tiny Engineers email: civil@rmengineer.com %9 ) July 9, 2008 Chris Haver Building Official City of College Station 1101 Texas Avenue South College Station, TX 77842 chaver@csix.gov RE: AliSafe Storage(Phase Two),College Station Deletion of H/C Cross-walk& Pedestrian Gate 13101 Wellborn Road,College Station,TX RME No. 219-0319 Chris Haver: Per my phone conversations with Mr. Pete Kountakis (owner of the A1lSafe facility) and his operator on location their mode of operation for assisting H/C clients is briefly as follows: 1. Provide current accessible ingress/egress to the office building via the existing H/C parking space and accessibly path; 2. Once all paper work is completed then the H/C client is returned to their vehicle and they follow the operations manager to their rental space via vehicular means; 3. Rental spaces have/will be reserved that are at the end of buildings and have the shortest/direct access with an ambulatory ramp from where the vehicle would park to load or unload storage goods. Based on this information the proposed 4' wide pedestrian gate and 4' H/C pedestrian walkway, to and between Buildings "C" and "D", may be deleted and not constructed/installed as illustrated on the Construction Drawings issued by this office on 10/08/07 and permitted by CoCS on 10/29/07. Please do not hesitate to call if you have any questions. Sincerely, A f FEZ 7 --- OCA2-KINRabonA. Metcalf, P.E.N A rabon@rmengineer.com r-. CD1-219-0319-L07 v,S S WAG c t,......_Off: (979)690-0329 ME ars...° Fax: (979)690-0329 Gonsa/-ttny Ery1neers email:civil@rmengineer.com August 20, 2007 Jennifer Prochazka Senior Planner 4 nCityofCollegeStation P.O. Box 9960 College Station, TX 77842 RE: AllSafe Storage,PH 2—Second Submittal RME No.219-0319 Jennifer Prochazka: Please find attached the following for the above referenced project: 1 copy—StaffReview Comment Sheet; 2 copies—Revised Site Plan; 1 copy—Revised Landscaping Plan; 1 copy— 11 x17 Revised Grading Plan; 1 copy— 11x17 Revised Erosion Control Plan; 1 copy—Complete Construction Set; 1 copy—Letter stating the existing detention pond is in good condition and has capacity for the proposed improvements; Please do not hesitate to call should you have any questions. Sincerely, afelOt AA"Gekirja. Adam J. rumbaugh,E.I.T. adam@rmengineer.com 1) # C1J: pie CD1-219-0319-L01 Page 1 of 1 t4iLuvi 1:to Fri I.wrrtn -1 01000Vuo4' rage L us J STAFF REVIEW COMMENTS NO. 9 Project: ALLSAFE STORAGE PH2 (SP)—07-00500183 P NING Please provide Non-Residential Architectural standard details, including: NRA application, a copy of building elevations for all buildings, color samples, and list of all building materials in legend form, as shown in Section 7.9 of the UDO). The information needed is included on the site plan checklist. Please use the requirements for sites with over 50,0pQ square nn 40, feet of building. This will also affect building footprint. WILL 6E .SciSim co %ow& raerni1 Iease include the required sidewalks and tree wells at the fronts of buildings (Section 9.E). Tease include location and details of required bicycle facility (NRA). Is the property line shown the new right-of-way line for FM 2154? s E7'G .1Pleaseprovideacurbandpavementdetailonthesiteplan. —II' Please better distinguish between existing improvements in Phase I and proposed v/ nv'provements in Phase II. Please provide all setbacks on the site plan. Please label throat depth. Minimum is 55 feet. Please be aware that because the drive aisles between structures is only 30 feet, and th ire lane minimum is 20 feet, no parking will be allowed in these areas. SEE 5,7E No?E FFio or.,. Please show distance from structures to single-family lot lines. Please be aware that according to the UDO Section 7.1.H Height, the structure shown can only be a height of 1/2 distance. 0_•0- -ase provide overall height of structures on the site plan. y. Provide a general note that all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be cool nated with the building architecture and scale to maintain a 14nified appearance. -SE 5,JE A/are # lease note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Jennifer Prochazka Date: August 6, 2007 fl r LAJDSCAPINGISTREETSCAPING/BUFFER ccording to Section 7.9. E.3, landscape points must be doubled for this site. lease provide irrigation information. Sim 1RRIGIAJOAf Ateggs Sizes of canopy and non-canopy trees should be given_ inc peri hes for - single cane easured at 12" above grade. SEE friIs the buffer already installed behind phase II? Please show plantings indicate whether fisting or proposed). ii,Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights-of-way,, and dacent property disturbed during construction. LPr1Jd 50PE A 2- Reviewed by: Jennifer Prochazka Date: August 6, 2007 NOTE: Any changes made to the plans,that have not been requested by the City ofCollege Station,must be explained in your next transmittalhalerand"bubbled"on your plans.Any additional changers on these plans tialhave nig ixrn fxnnttal out to the City,will roristiu,te a completely new review. Page 2 of 3 14/2007 1:16 PM UwrAli -, y 1 bJUUiLrage a of 3 MIS LLANEOUS Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Checic Back Flow Device, and installed s per City Ordinance 2394. ,56-& A I1tWEICZC6 4 A&1 2 All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. SERRt& /0/4 NOTE *5 FIRE ARTMENT S,yG 6cc "oA/E QoP tsc J.1 Please detail any gates or fencing for fire access. 1,6065TRi/ 6A-TE Reviewed by: Steve Smith Date: August 14, 2007 ENGIN ERING COMMENTS NO. 1 Revise/modify drawings to fit within current property lines. (Hasn't TxDOT already acquired ROW?) Verify that the detention pond is functioning as designed. Provide any modifications necessary (regrading, silt removal, etc.) SSE A- Thtrh5b Len-ER t Verify that there is enough room between theafire hydrant the wroughtht iITEp ronfence for fire department to access/operate properly. Add erosion control measures to detention pond outlet pipe. Am t 1 goct,C FEW-- 5i1 erGI,D Reviewed by: Carol Cotter Date: August 10, 2007 SA TION Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: July 31, 2007 GENERAL ELECTRICAL COMMENTS z.Existing electrical service was installed to include future development.Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: weido@cstx.gov. eveloper provides load data for project. o discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 8-1-07 NOTE: Any changes made to the plans,unit have not been requested by the City ofCollege Station,must be explained is.your twit trannmtuilletterand"bubbled"on your plans.Any additional changes on Obese plans that have not.been poinirtl tut to the City,will constituteto 3 completely new review. i 1 Off: (979) 690-0329 (ji.MEFax: (979)690-0329mGonsu/tln9 Engineers email:civil@rmengineer.corn I I October 8, 2007 Jennifer Prochazka Senior Planner City of College Station P.O. Box 9960 College Station,TX 77842 RE: AliSafe Storage,PH 2—Third Submittal RME No. 219-0319 Jennifer Prochazka: Please find attached the following for the above referenced project: 1 copy—Staff Review Comment Sheet; 1 copy—Agreement letter between City of College Station and Pete Kountakis, dated May 23, 2005; 1 copy—TCEQ Exception Letter(Water Line Improvements); 1 copy—Letter acknowledging City of College Station standards; 2 copies—Revised Site Plan (C1.1 & C3.1); 1 copy—Revised Landscaping Plan; 1 copy— 11x 17 Revised Grading Plan; 1 copy— 11x17 Revised Erosion Control Plan; 11 copies—Complete Construction Sets with applicable B/CS Standards (Return 4 copies to RME); Please do not hesitate to call should you have any questions. Sincerely, Adam J.baugh, E.I. adan10 rinengineer.cona 1.11teA i CD1-219-0319-L03 Page 1 of 1 5/2007 2:39 PM GWFAX -> 9796900329 page L of c STAFF REVIEW COMMENTS NO. 2 Project: ALLSAFE STORAGE PH2 (SP) - 07-00500183 PLANNING Are the tree wells proposed to be at grade or raised? Please provide det 'Is of tree IIs (see COCS Site Design Standards for standard details).e C Lra- Please provide dimensions and details of the proposed bicycle facility (see COCS Site Design Standards for standard details). , y Please provide detail of treatment of"5' pedestrian walk"through parking lot. erThe required 10' pedestrian facility in front of the structures needs to be a sidewalk including 6" curbing, etc.) Since facade articulation is required along these structures (Section 7.a.E.1 of the & '7i ified Development Ordinance), the building footprint needs to reflect the requirement. ijcE t 1 site details (such as the curb and pavement detail) are to be provided on a separateIf e sheet, that sheet will need to be'page 2' of the site plan and submitted with all site plan submittals. xsor Please note on the landscape plan that the caliper inch measurement for the non- canopy trees is for a single-cane. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" onyourplans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Jennifer Prochazka Date: August 29, 2007 Lk ., avityvt rsietira? vutd NA elitilYVIAlittj 4 r at tO rifJ P.641)1a . Skt..h,cr t0A.(L \0 • lut•el NOTE: Any chunyrs made to the plots,that have 110t been requested by the City o)[College Station,(Must be explained r1 your next transmittal letter and"bobbled"ori your plans. Any additional changes on these plans that,have not.been pointed out to die.City,will o ntitu t-2 completely new review. 7 9 329 ME Off: (9 9)6 0 0 Fax: (979) 690-0329 1r- C.onsu/tfn9 Eny/neers email:civil@rmengineer.com October 8, 2007 Mc° Jennifer Prochazka Senior Planner b City of College Station P.O. Box 9960 College Station, TX 77842 RE: AllSafe Storage, PH 2-Third Submittal RME No. 219-0319 Jennifer Prochazka: Please find attached the following for the above referenced project: 1 copy-Staff Review Comment Sheet; 517 1 copy-Agreement letter between City of College Station and Pete Kountakis, dated May 23, 2005;S? 1 copy-TCEQ Exception Letter(Water Line Improvements); Grp' DP 1 copy-Letter acknowledging City of College Station standards;SP i* 2 copies-Revised Site Plan(C1.1 & C3.1);-ST 1 copy-Revised Landscaping Plan; 5 P 1 copy- 11x17 Revised Grading Plan; Dr 1 copy- 11x17 Revised Erosion Control Plan; 'OP 11 copies-Complete Construction Sets with applicable B/CS Standards (Return 4 copies to RME); f Please do not hesitate to call should you have any questions. Sincerely, afOrk-- Adam J. B Baugh, E.I. adam@rmengineer.com NI leA ce4Plidel ( "t. CD1-219-0319-L03 Page 1 of 1 C 1 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITYOF COLLEGE STATION MEMORANDUM Sept 5, 2007 TO: Adam J. Brumbaugh, RME Consulting Engineers, via fax: 979-690-0329 FROM: Jennifer Prochazka, AICP, Senior Planner SUBJECT: ALLSAFE STORAGE PH2 (SP)- Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: Seven (7) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Two (2) revised site plans One (1) landscaping plan One (1) 11x17 grading and erosion control plan Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments pc: Case file #07-00500183 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 1 of 2 STAFF REVIEW COMMENTS NO. 2 Project: ALLSAFE STORAGE PH2 (SP) - 07-00500183 PLANNING 1. Are the tree wells proposed to be at grade or raised? Please provide details of tree wells (see COOS Site Design Standards for standard details). 2. Please provide dimensions and details of the proposed bicycle facility (see COOS Site Design Standards for standard details). 3. Please provide detail of treatment of "5' pedestrian walk" through parking lot. 4. The required 10' pedestrian facility in front of the structures needs to be a sidewalk including 6" curbing, etc.) 5. Since facade articulation is required along these structures (Section 7.9.E.1 of the Unified Development Ordinance), the building footprint needs to reflect the requirement. 6. If site details (such as the curb and pavement detail) are to be provided on a separate sheet, that sheet will need to be 'page 2' of the site plan and submitted with all site plan submittals. 7. Please note on the landscape plan that the caliper inch measurement for the non- canopy trees is for a single-cane. 8. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Jennifer Prochazka Date: August 29, 2007 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2 0 4-r- -"NI CITY OF COLLEGE STATION 23 May 2005 Via Fax Copy to: 979.776.1482 Pete Kountakis 2401 East 29th Street Bryan, TX 77802 RE: Allsafe Storage, 1301 FM 2154, College Station, TX Dear Mr. Kountakis: Thanks for taking the time to meet with me this morning to talk about code compliance issues for the above referenced project. As a follow-up to our meeting, I wanted to\, document the discussion items. My notes from the meeting reflect the following: u' The building material on the facades facing Wellborn Road will be brick, stone marble, granite, tile, or other material approved by the Unified Development Ordinance. Building colors will match the approved color palette(please submit proposed colors for approval with the construction documents). Mechanical equipment and solid waste containers visible from residential areas or the public ROW will be screened from view. The building material on the south side of proposed building"D"will be brick, stone, marble, granite, tile, etc. (Stucco, EIFS,hardboard, concrete products w/integrated color or pattern also allowable but limited to 75% of facade). The south side ofproposed building"D" will also have brick, stone, marble, granite, or split face masonry on the lower 30 inches of the exterior wall. Architectural relief incorporating two design elements (canopies,wall plane projections/recessions,vertical expression of structural bays, columns,pilasters, etc.) will be provided for every 45' of facades facing Wellborn Road. If stone veneer matching the existing office is used on these facades, this requirement will not be necessary. The facades facing Wellborn Road will be limited to one personnel door each overhead doors will not be allowed). A revised site plan showing the two proposed buildings "C" and"D" (deleting proposed buildings "E" and"F")will be submitted for review and approval. the heart ofthe Research Valley P.O.BOX 9960 1101 TEXAS AVENUE COLLEGE STATION.TEXAS-77842 979.764.3510 www.cstx.gov Pete Kountakis Letter—Pg.2 Construction documents and a completed building permit application for buildings "C" and"D"will be submitted for review and approval. Please contact me at 979.764.3570 should you have questions or corrections concerning any of the items. Sincerely, Lance Simms, CBO Assistant Director of Planning&Development Services City of College Station 1101 TEXAS AVENUE COLLEGE STATION TX 77840 TEMPORARYL— S----- ' CO TEMPORARY Issue Date 10/31/08 Expiration Date . . . 11/21/08 Parcel Number 244010-0001-0040 Property Address . . 13101 FM 2154 C COLLEGE STATION TX 77845 Subdivision Name . . . EDELWEISS BUSINESS CENTER Legal Description . . . EDELWEISS BUSINESS CENTER BLOCK 1 LOT 4 Property Zoning . . . UNKNOWN Owner Contractor PREMIER BUILDERS INC 979 776-2212 Application number . . 07-00001345 000 000 Description of Work . . COMMERCIAL, OTHER Construction type . . . NON-COMBUSTIBLE Occupancy type . . . . STORAGE-MOD. HAZARD Flood Zone Special conditions . N-e. - _ . ' . - .. a -j-ac .t- stu-rbed=:di-rt--,(--is ed) . 1 S ghting on front of building does not meet code (not Q contained within opaque housing) . Realeve ruatcria l_,,oma--ground--•at----rear_ef pr^j t y. pPmniLe f rtaal.cn. Approved r OfficialBu' .ing VOID UNLESS SIGNED BY BUILDING OFFICIAL