HomeMy WebLinkAbout07-183 Documentstnir
IO/D /U
PIE
P.O.Box 9253,College Station,TX 77842
Off/Fax:(979)690-0329
C.onsu/tiny Engineers email: civil@rmengineer.com %9 )
July 9, 2008
Chris Haver
Building Official
City of College Station
1101 Texas Avenue South
College Station, TX 77842
chaver@csix.gov
RE: AliSafe Storage(Phase Two),College Station
Deletion of H/C Cross-walk& Pedestrian Gate
13101 Wellborn Road,College Station,TX
RME No. 219-0319
Chris Haver:
Per my phone conversations with Mr. Pete Kountakis (owner of the A1lSafe facility) and his
operator on location their mode of operation for assisting H/C clients is briefly as follows:
1. Provide current accessible ingress/egress to the office building via the existing H/C
parking space and accessibly path;
2. Once all paper work is completed then the H/C client is returned to their vehicle and they
follow the operations manager to their rental space via vehicular means;
3. Rental spaces have/will be reserved that are at the end of buildings and have the
shortest/direct access with an ambulatory ramp from where the vehicle would park to
load or unload storage goods.
Based on this information the proposed 4' wide pedestrian gate and 4' H/C pedestrian walkway,
to and between Buildings "C" and "D", may be deleted and not constructed/installed as
illustrated on the Construction Drawings issued by this office on 10/08/07 and permitted by
CoCS on 10/29/07.
Please do not hesitate to call if you have any questions.
Sincerely,
A f FEZ
7 --- OCA2-KINRabonA. Metcalf, P.E.N A
rabon@rmengineer.com
r-.
CD1-219-0319-L07
v,S
S WAG c
t,......_Off: (979)690-0329
ME
ars...°
Fax: (979)690-0329
Gonsa/-ttny Ery1neers email:civil@rmengineer.com
August 20, 2007
Jennifer Prochazka
Senior Planner 4 nCityofCollegeStation
P.O. Box 9960
College Station, TX 77842
RE: AllSafe Storage,PH 2—Second Submittal
RME No.219-0319
Jennifer Prochazka:
Please find attached the following for the above referenced project:
1 copy—StaffReview Comment Sheet;
2 copies—Revised Site Plan;
1 copy—Revised Landscaping Plan;
1 copy— 11 x17 Revised Grading Plan;
1 copy— 11x17 Revised Erosion Control Plan;
1 copy—Complete Construction Set;
1 copy—Letter stating the existing detention pond is in good condition and has capacity
for the proposed improvements;
Please do not hesitate to call should you have any questions.
Sincerely,
afelOt AA"Gekirja.
Adam J. rumbaugh,E.I.T.
adam@rmengineer.com
1) #
C1J:
pie
CD1-219-0319-L01 Page 1 of 1
t4iLuvi 1:to Fri I.wrrtn -1 01000Vuo4' rage L us J
STAFF REVIEW COMMENTS NO. 9
Project: ALLSAFE STORAGE PH2 (SP)—07-00500183
P NING
Please provide Non-Residential Architectural standard details, including: NRA application, a
copy of building elevations for all buildings, color samples, and list of all building materials
in legend form, as shown in Section 7.9 of the UDO). The information needed is included
on the site plan checklist. Please use the requirements for sites with over 50,0pQ square nn
40,
feet of building. This will also affect building footprint. WILL 6E .SciSim co %ow& raerni1
Iease include the required sidewalks and tree wells at the fronts of buildings (Section
9.E).
Tease include location and details of required bicycle facility (NRA).
Is the property line shown the new right-of-way line for FM 2154?
s E7'G .1Pleaseprovideacurbandpavementdetailonthesiteplan. —II'
Please better distinguish between existing improvements in Phase I and proposed
v/
nv'provements in Phase II.
Please provide all setbacks on the site plan.
Please label throat depth. Minimum is 55 feet.
Please be aware that because the drive aisles between structures is only 30 feet, and th
ire lane minimum is 20 feet, no parking will be allowed in these areas. SEE 5,7E No?E FFio
or.,. Please show distance from structures to single-family lot lines. Please be aware that
according to the UDO Section 7.1.H Height, the structure shown can only be a height of 1/2
distance.
0_•0- -ase provide overall height of structures on the site plan.
y. Provide a general note that all roof and ground-mounted mechanical equipment shall be
screened from view or isolated so as not to be visible from any public right-of-way or
residential district within 150' of the subject lot, measured from a point five feet above grade.
Such screening shall be cool nated with the building architecture and scale to maintain a
14nified
appearance. -SE 5,JE A/are #
lease note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not be made of aware of will
constitute a completely new review.
Reviewed by: Jennifer Prochazka Date: August 6, 2007
fl r
LAJDSCAPINGISTREETSCAPING/BUFFER
ccording to Section 7.9. E.3, landscape points must be doubled for this site.
lease provide irrigation information. Sim 1RRIGIAJOAf Ateggs
Sizes of canopy and non-canopy trees should be given_ inc peri hes for - single cane
easured at 12" above grade. SEE
friIs the buffer already installed behind phase II? Please show plantings indicate whether
fisting or proposed).
ii,Provide a general note that 100% coverage of groundcover, decorative paving, decorative
rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the
parking lot setback, rights-of-way,, and dacent property disturbed during construction.
LPr1Jd 50PE A 2-
Reviewed by: Jennifer Prochazka Date: August 6, 2007
NOTE: Any changes made to the plans,that have not been requested by the City ofCollege Station,must be explained in your next transmittalhalerand"bubbled"on your plans.Any additional changers on these plans tialhave nig ixrn fxnnttal out to the City,will roristiu,te a
completely new review.
Page 2 of 3
14/2007 1:16 PM UwrAli -, y 1 bJUUiLrage a of 3
MIS LLANEOUS
Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced
Pressure Principle Back Flow Device, or a Double-Checic Back Flow Device, and installed
s per City Ordinance 2394. ,56-& A I1tWEICZC6
4
A&1 2
All BackFlow devices must be installed and tested upon installation as per City Ordinance
2394. SERRt& /0/4 NOTE *5
FIRE ARTMENT S,yG 6cc "oA/E QoP tsc
J.1 Please detail any gates or fencing for fire access.
1,6065TRi/ 6A-TE
Reviewed by: Steve Smith Date: August 14, 2007
ENGIN ERING COMMENTS NO. 1
Revise/modify drawings to fit within current property lines. (Hasn't TxDOT already
acquired ROW?)
Verify that the detention pond is functioning as designed. Provide any modifications
necessary (regrading, silt removal, etc.) SSE A- Thtrh5b Len-ER
t Verify that there is enough room between theafire hydrant the wroughtht iITEp
ronfence for
fire department to access/operate properly.
Add erosion control measures to detention pond outlet pipe. Am t 1 goct,C FEW-- 5i1 erGI,D
Reviewed by: Carol Cotter Date: August 10, 2007
SA TION
Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: July 31, 2007
GENERAL ELECTRICAL COMMENTS
z.Existing electrical service was installed to include future development.Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to:
weido@cstx.gov.
eveloper provides load data for project.
o discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 8-1-07
NOTE: Any changes made to the plans,unit have not been requested by the City ofCollege Station,must be explained is.your twit trannmtuilletterand"bubbled"on your plans.Any additional changes on Obese plans that have not.been poinirtl tut to the City,will constituteto
3
completely new review.
i 1
Off: (979) 690-0329 (ji.MEFax: (979)690-0329mGonsu/tln9 Engineers email:civil@rmengineer.corn I I
October 8, 2007
Jennifer Prochazka
Senior Planner
City of College Station
P.O. Box 9960
College Station,TX 77842
RE: AliSafe Storage,PH 2—Third Submittal
RME No. 219-0319
Jennifer Prochazka:
Please find attached the following for the above referenced project:
1 copy—Staff Review Comment Sheet;
1 copy—Agreement letter between City of College Station and Pete Kountakis, dated
May 23, 2005;
1 copy—TCEQ Exception Letter(Water Line Improvements);
1 copy—Letter acknowledging City of College Station standards;
2 copies—Revised Site Plan (C1.1 & C3.1);
1 copy—Revised Landscaping Plan;
1 copy— 11x 17 Revised Grading Plan;
1 copy— 11x17 Revised Erosion Control Plan;
11 copies—Complete Construction Sets with applicable B/CS Standards (Return 4 copies
to RME);
Please do not hesitate to call should you have any questions.
Sincerely,
Adam J.baugh, E.I.
adan10 rinengineer.cona
1.11teA i
CD1-219-0319-L03 Page 1 of 1
5/2007 2:39 PM GWFAX -> 9796900329 page L of c
STAFF REVIEW COMMENTS NO. 2
Project: ALLSAFE STORAGE PH2 (SP) - 07-00500183
PLANNING
Are the tree wells proposed to be at grade or raised? Please provide det 'Is of tree
IIs (see COCS Site Design Standards for standard details).e C Lra-
Please provide dimensions and details of the proposed bicycle facility (see COCS Site
Design Standards for standard details). , y
Please provide detail of treatment of"5' pedestrian walk"through parking lot.
erThe required 10' pedestrian facility in front of the structures needs to be a sidewalk
including 6" curbing, etc.)
Since facade articulation is required along these structures (Section 7.a.E.1 of the & '7i
ified Development Ordinance), the building footprint needs to reflect the requirement. ijcE t 1
site details (such as the curb and pavement detail) are to be provided on a separateIf
e
sheet, that sheet will need to be'page 2' of the site plan and submitted with all site plan
submittals.
xsor Please note on the landscape plan that the caliper inch measurement for the non-
canopy trees is for a single-cane.
Please note that any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" onyourplans. Any additional changes on these plans that the City has not been made
aware of will constitute a completely new review.
Reviewed by: Jennifer Prochazka Date: August 29, 2007
Lk ., avityvt
rsietira?
vutd NA elitilYVIAlittj 4
r at tO rifJ P.641)1a .
Skt..h,cr t0A.(L \0 • lut•el
NOTE: Any chunyrs made to the plots,that have 110t been requested by the City o)[College Station,(Must be explained r1 your next transmittal
letter and"bobbled"ori your plans. Any additional changes on these plans that,have not.been pointed out to die.City,will o ntitu
t-2
completely new review.
7 9 329
ME
Off: (9 9)6 0 0
Fax: (979) 690-0329
1r-
C.onsu/tfn9 Eny/neers email:civil@rmengineer.com
October 8, 2007 Mc°
Jennifer Prochazka
Senior Planner b
City of College Station
P.O. Box 9960
College Station, TX 77842
RE: AllSafe Storage, PH 2-Third Submittal
RME No. 219-0319
Jennifer Prochazka:
Please find attached the following for the above referenced project:
1 copy-Staff Review Comment Sheet; 517
1 copy-Agreement letter between City of College Station and Pete Kountakis, dated
May 23, 2005;S?
1 copy-TCEQ Exception Letter(Water Line Improvements); Grp' DP
1 copy-Letter acknowledging City of College Station standards;SP i*
2 copies-Revised Site Plan(C1.1 & C3.1);-ST
1 copy-Revised Landscaping Plan; 5 P
1 copy- 11x17 Revised Grading Plan; Dr
1 copy- 11x17 Revised Erosion Control Plan; 'OP
11 copies-Complete Construction Sets with applicable B/CS Standards (Return 4 copies
to RME); f
Please do not hesitate to call should you have any questions.
Sincerely,
afOrk--
Adam J. B Baugh, E.I.
adam@rmengineer.com
NI leA
ce4Plidel ( "t.
CD1-219-0319-L03 Page 1 of 1
C 1 1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
CITYOF COLLEGE STATION
MEMORANDUM
Sept 5, 2007
TO: Adam J. Brumbaugh, RME Consulting Engineers, via fax: 979-690-0329
FROM: Jennifer Prochazka, AICP, Senior Planner
SUBJECT: ALLSAFE STORAGE PH2 (SP)- Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. The next submittal will be the third
and final review by staff for this round of reviews. If all items have not been addressed on the
next submittal, another $200 processing fee will need to be submitted for the subsequent set of
three (3) reviews. Please address the comments and submit the following information for
further staff review:
Seven (7) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached (one set will
be returned to you, please submit additional copies if you want more than one
approved set)
Two (2) revised site plans
One (1) landscaping plan
One (1) 11x17 grading and erosion control plan
Please note that the Easement Dedication Sheet and necessary documents are required prior
to the issuance of a building permit. If there are comments that you are not addressing with the
revised site plan, please attach a letter explaining the details. If you have any questions or need
additional information, please call me at 979.764.3570.
Attachments: Staff review comments
pc:
Case file #07-00500183
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a
completely new review. Page 1 of 2
STAFF REVIEW COMMENTS NO. 2
Project: ALLSAFE STORAGE PH2 (SP) - 07-00500183
PLANNING
1. Are the tree wells proposed to be at grade or raised? Please provide details of tree
wells (see COOS Site Design Standards for standard details).
2. Please provide dimensions and details of the proposed bicycle facility (see COOS Site
Design Standards for standard details).
3. Please provide detail of treatment of "5' pedestrian walk" through parking lot.
4. The required 10' pedestrian facility in front of the structures needs to be a sidewalk
including 6" curbing, etc.)
5. Since facade articulation is required along these structures (Section 7.9.E.1 of the
Unified Development Ordinance), the building footprint needs to reflect the requirement.
6. If site details (such as the curb and pavement detail) are to be provided on a separate
sheet, that sheet will need to be 'page 2' of the site plan and submitted with all site plan
submittals.
7. Please note on the landscape plan that the caliper inch measurement for the non-
canopy trees is for a single-cane.
8. Please note that any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made
aware of will constitute a completely new review.
Reviewed by: Jennifer Prochazka Date: August 29, 2007
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a
completely new review. Page 2 of 2
0 4-r- -"NI
CITY OF COLLEGE STATION
23 May 2005
Via Fax Copy to: 979.776.1482
Pete Kountakis
2401 East 29th Street
Bryan, TX 77802
RE: Allsafe Storage, 1301 FM 2154, College Station, TX
Dear Mr. Kountakis:
Thanks for taking the time to meet with me this morning to talk about code compliance
issues for the above referenced project. As a follow-up to our meeting, I wanted to\,
document the discussion items. My notes from the meeting reflect the following:
u'
The building material on the facades facing Wellborn Road will be brick, stone
marble, granite, tile, or other material approved by the Unified Development
Ordinance.
Building colors will match the approved color palette(please submit proposed
colors for approval with the construction documents).
Mechanical equipment and solid waste containers visible from residential areas or
the public ROW will be screened from view.
The building material on the south side of proposed building"D"will be brick,
stone, marble, granite, tile, etc. (Stucco, EIFS,hardboard, concrete products
w/integrated color or pattern also allowable but limited to 75% of facade).
The south side ofproposed building"D" will also have brick, stone, marble,
granite, or split face masonry on the lower 30 inches of the exterior wall.
Architectural relief incorporating two design elements (canopies,wall plane
projections/recessions,vertical expression of structural bays, columns,pilasters,
etc.) will be provided for every 45' of facades facing Wellborn Road. If stone
veneer matching the existing office is used on these facades, this requirement will
not be necessary.
The facades facing Wellborn Road will be limited to one personnel door each
overhead doors will not be allowed).
A revised site plan showing the two proposed buildings "C" and"D" (deleting
proposed buildings "E" and"F")will be submitted for review and approval.
the heart ofthe Research Valley
P.O.BOX 9960
1101 TEXAS AVENUE
COLLEGE STATION.TEXAS-77842
979.764.3510
www.cstx.gov
Pete Kountakis Letter—Pg.2
Construction documents and a completed building permit application for
buildings "C" and"D"will be submitted for review and approval.
Please contact me at 979.764.3570 should you have questions or corrections concerning
any of the items.
Sincerely,
Lance Simms, CBO
Assistant Director of Planning&Development Services
City of College Station
1101 TEXAS AVENUE
COLLEGE STATION TX 77840
TEMPORARYL—
S----- '
CO
TEMPORARY
Issue Date 10/31/08
Expiration Date . . . 11/21/08
Parcel Number 244010-0001-0040
Property Address . . 13101 FM 2154 C
COLLEGE STATION TX 77845
Subdivision Name . . . EDELWEISS BUSINESS CENTER
Legal Description . . . EDELWEISS BUSINESS CENTER
BLOCK 1
LOT 4
Property Zoning . . . UNKNOWN
Owner
Contractor PREMIER BUILDERS INC
979 776-2212
Application number . . 07-00001345 000 000
Description of Work . . COMMERCIAL, OTHER
Construction type . . . NON-COMBUSTIBLE
Occupancy type . . . . STORAGE-MOD. HAZARD
Flood Zone
Special conditions .
N-e. - _ . ' . - .. a -j-ac .t- stu-rbed=:di-rt--,(--is
ed) .
1 S ghting on front of building does not meet code (not
Q contained within opaque housing) .
Realeve ruatcria l_,,oma--ground--•at----rear_ef pr^j t y.
pPmniLe f rtaal.cn.
Approved r
OfficialBu' .ing