HomeMy WebLinkAboutStaff Review ffs..44 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 /—� Phone 979.764.3570 / Fax 979.764.3496 CITY OF COLLEGE STATION MEMORANDUM October 20, 2008 TO: Greens Prairie Investors, LLC via fax: 979-690-1041 FROM: Lauren A. Hovde, Staff Planner SUBJECT: CASTLE ROCK AMENITIES CENTER (SP)- Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Cover memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Seven (7) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set); Four (4) revised site plans; One (1) landscaping plan; One (1) 11x17 grading and erosion control plan; Easement Dedication Sheet and required documents (please note that the Site Plan will not be stamped approved until the Blanket Easement, or all other appropriate easements, have been dedicated to the City of College Station). If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact me at 979.764.3570. Attachments: Staff review comments pc: Joe Schutz, P.E., Civil Development, Ltd. via fax: 979-764-7759 Case file #08-00500245 STAFF REVIEW COMMENTS NO. 1 Project: CASTLE ROCK AMENITIES CENTER (SP) — 08-00500245 PLANNING 1. The site plan can not be approved until Phase 2B Final Plat is filed. 2. Please submit an electrical plan, and irrigation plan which is stamped by licensed irrigator. 3. The volume and page number for all easement should be shown on the site plan. 4. Please show existing and proposed fire lanes. 5. Please provide a curb and pavement detail on the site plan. 6. Provide a general note that all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 7. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Lauren A. Hovde, Staff Planner Date: October 20, 2008 TXDOT No comments, not applicable. LANDSCAPING/STREETSCAPING/BUFFER 1. Landscape points seem to be calculated correctly. However, the total points required is shown to be 1902, and there are 2054 points needed (1140 for streetscape and 914 for landscaping). 2. The material of the ornamental fence needs to be identified on site plan. Thank you. 3. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock (not loose), or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights-of-way, and adjacent property disturbed during construction. 4. FYI...Loose rock is not a permitted ground cover. Reviewed by: Lauren A. Hovde, Staff Planner Date: October 20, 2008 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes or provides descriptive easements for electric infrastructure as designed by CSU for electric lines (where applicable, including street lights). 2. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to bread@cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact Brent Read at 979.764.5026. Reviewed by: Brent Read Date: October 17, 2008 FIRE 1) No comments. Reviewed by: Steve Smith Date: 10/15/08